Installation & Assembly
3. Assemble a 12-1/2" wall frame using (2)
two 72" long 2x4s. (2) two 12-1/2” long
2x4s and header support.
12-1/2"
12-1/2"
60" Top Plate
23-1/4"
24"
60" Plate
69-1/2" Header
Support
69-1/2" Header
Support
Step 5 Set Walls
1. Secure wall panels together at the corners. Use (4) four 10d sinkers per corner. Nail wall
panels to the floor. Nail through the bottom plate. Space 10d sinkers 24" apart.
2. Disassemble the shipping pallets
and remove the (4) four 2x4s from
each pallet. The bit for the screws
is in the hardware bag.
2x4 Wall Brace
Step 4 Assemble Front Wall Frames
3. Use (2) two of the 2x4s to brace
the door walls to hold them
straight. Save the other 2x4s,
they will be used in a later step.
If you want the door opening to be
on the right, reverse the un-sided
wall frames.
1. Cut (2) two 72" long 2x4s to 69-1/2" used for header supports.
2. Select a 68-1/2" long 2x4. Cut (2) two boards 12-1/2" in length. Save the leftover 2x4, it will
be used in a later step.
4. Assemble a 60" wall frame using (4) four
72" long 2x4s, (2) two 60" long 2x4s and
header support.