Installation & Assembly
4. Install the other end wall panel and the 13-1-2"
wall frame. Brace wall frame with another 2x4
from the shipping pallet.
2x4 - 51-1/2"
2x4 - 51-1/2"
2x4 Header Support
5-1/2" High Siding
Step 5 Set Walls
1. Set the back wall and end wall on
floor. Secure walls at corner with
10d coated sinkers. Nail bottom plate
to floor. Use leftover galv. nails from
the wood floor assembly.
2. Set the larger front wall panel.
5. Insure walls are plum and door
opening is square.
6. Install (2) two 51-1/2" long 2x4s.
Nail 1st board into top of header
supports using 10d sinkers. Then
nail 2nd board to 1st.
3. Use one of the 2x4s from the shipping
pallet to brace the front wall.
7. Install a full width x 5-1/2" siding
panel over the door header. Install
flush with top of 2x4.
8. Install a 18" x 76-3/4" siding
panel to finish.