3307 Installation Manual Dual Fuel Ranges
22
INSTALLATION CHECKLIST FINAL PREPARATION
A qualifi ed installer should carry out the following 
checks:
Range mounted on its legs
Island trim or Backguard attached accor-
ding to instruction
Anti-tip device properly installed
Clearance to cabinet surfaces as manu-
facturer’s guideline
Proper ground connection
Gas service line connected following ma-
nufacturer’s guideline
Valves, stoppers and gasket installed 
between the range and the service line
Gas connection tested and free of gas 
leaks
Range settled for the type of gas available 
in the household
Each burner lights satisfactorily, both indi-
vidually and with other burners operating
Flame appear sharp blue, with no yellow 
tipping, shooting or fl ame lifting
Minimum settled for all burners
Oven light works properly
 • Before using  the  oven,  remove  any  protective 
wrap from the stainless steel. 
 • All stainless steel  body parts should  be wiped 
with hot, soapy water and with a liquid stainless 
steel cleanser. 
 • If buildup occurs, do not use steel wool, abrasi-
ve cloths, cleaners, or powders! 
 • If it is necessary to scrape stainless steel to re-
move  encrusted  materials,  soak  with  hot,  wet 
cloths to loosen the material, then use a wood 
or nylon scraper. 
 • Do not use a metal knife, spatula, or any other 
metal tool to scrape stainless steel! Scratches 
are almost impossible to remove.
 • Before  using  the  oven  for  food  preparation, 
wash  the  cavity  thoroughly  with  a  warm  soap 
and water solution to remove fi lm residues and 
any dust or debris from installation, then rinse 
and wiped dry.
Attention!
When  using  the  oven  for  the  fi rst  time  it 
should be operated for 15-30 minutes at a tem-
perature of  about 500°F/260°C (main oven) or 
440°F/227°C(auxiliary  oven)  without  cooking 
anything inside in order to eliminate any moi-
sture and odours from the internal insulation.
/ Installation checklist / fi nal preparation










