Service manual

96
5
55
5-
--
-1 Assembl
1 Assembl1 Assembl
1 Assemble power board on the lower case, and screw.
e power board on the lower case, and screw.e power board on the lower case, and screw.
e power board on the lower case, and screw.
Step1. Plug the wire of thermal breaker in the connector.
Step2. Plug in the wire of AC switch, and check the wire. Don’t block the screw hole as figure shows.
Step3. Assemble the capacity cap on the big capacity.
5
55
5-
--
-2
22
2 Assemble ballast board fixed with 2 holders on the lower case by screw. Plug in the wire of HV
Assemble ballast board fixed with 2 holders on the lower case by screw. Plug in the wire of HV Assemble ballast board fixed with 2 holders on the lower case by screw. Plug in the wire of HV
Assemble ballast board fixed with 2 holders on the lower case by screw. Plug in the wire of HV
and wire of MB to ballast.
and wire of MB to ballast.and wire of MB to ballast.
and wire of MB to ballast.
Check the wire arrangement must follow figure shows.
Step1. Assemble the holder 2 first, then insert the Mylar ballast, and at last assemble the holder 1 and
2 wires.