Quick Start Guide
Table Of Contents
- Copyright
- Disclaimer
- Display installation guide
- Video wall installation guide
- Precautions
- Notes on moving the display
- Installing
- Installing edge finishing kit: PL460/PH460/PH550/PL550
- Making a daisy chain
- Different types of daisy chain
- Operating Instructions of Edge Alignment Kit/Pin: PL490/PL552/PL553/PH5501/PH5502
- Tiling: PL490/PL552/PL553/PH5501/PH5502
- Operating Instructions of Edge Alignment Kit/Pin: PL4901/PL5501/PL5502
- Tiling: PL4901/PL5501/PL5502
- Special signage installation guide
- Mounting installation
- Digital Signage Bar-Type Series
- Digital Signage Rotation/Portrait Guide
- Troubleshooting
- Preventing afterimage burn-in
- Appendix 1: Installation Checklists
- Appendix 2: Basic Troubleshooting Checklists for IFP & IL series
- Appendix 3: Basic Troubleshooting Checklists for Video Wall
- Appendix 4: Basic Troubleshooting Checklists for X-Sign
6 Display installation guide
Always move the display by at least two (2) adults with both
hands.
Lay down the display gently and horizontally.
When you want to place the display face down, prepare a flat
and horizontal surface that is larger than the display and
spread a thick protective sheet on it.
Be careful not to scratch any parts of the display when
upturning the display.
Lift the display up horizontally by holding the four (4) handles.
Do not lift the display against its corner.
90° 90°