Product Manual

25
• OPEN valves S3 and S4.
Press the LOWER button until both ramps lower to the
oor.
CLOSE valves S3 and S4.
OPEN MAIN valve
Lift will not raise completely
Lower the lift until it reaches  oor level.
CLOSE MAIN valve.
• OPEN valves S3 and S4.
Press the RAISE button until lift approximately 24”
• CLOSE valves S3 and S4.
• OPEN MAIN valve
Press the LOWER button until the ramps are lowered
to the  oor.
CLose the MAIN valve
Open S3 and S4 valves
Press the RAISE Button until the lift approximately 24”
above the  oor.
Close the S3 and S4 Valves
Open the MAIN Valve
Press the LOWER button until the ramps are lowered
to the  oor.
Repeat until the ramps cannot be lowered to the  oor.
Close the MAIN valve.
Open S3 and S4 valves.
Press the LOWER button until the ramps are lowered
to the  oor.
Close the S3 and S4 valves.
Open the main valve.
After Bleeding and Leveling the Baseplates have
moved out of position
Reposition the Baseplates to the correct posi-
tions before installing anchor bolts.
If a component has been replaced. Bleeding
and Leveling must be repeated with the hydraulic sys-
tem partially  lled with  uid.
Call customer service immediately. The com-
plexity of different situations requires Bendpak experts
to assist you in correctly bringing your lift back to
working condition.
OVER PRESSURE:
NOTE: Avoid pressing the raise button if the lift is in the
maximum raised position. The sound of the motor will
change in this situation. If the lift has been raised and
the “raise” button has continued to be pressed, press the
“lower” button for 1 second to relive system pressure.