Product Manual

12
STEP 3
(Column Preparation)
COMPLETE THE FOLLOWING
PRIOR STANDING UP COLUMNS.
1. Slide Lift Head up Column to aid in Pulley removal and
Equalizer Cable routing. (See Fig 3.1)
2. Temporarily remove the cable sheaves located at the
inside bottom of each Column. (Fig. 3.2)
3. Route the button around the bottom sheave and secure
at the carriage lock plate located inside each Lift Head.
Route threaded end of cable upwards through the bottom of
the carriage. Leave excess cable resting on top of carriage
until further steps are required. (See Fig 3.3 and 3.4)
4. Install the straight and elbow Cylinder Fittings in
Cylinder Ports. Pay attention when installing the elbow
ttings to ensure that each tting points towards the side
of the Column that the hose retainer clips are located on.
(See Fig 3.5)
Fig 3.1
Slide Lift
Head upwards
Fig 3.2
Remove cable
sheaves
Threaded end of cable
routed up through car-
riage towards Overhead
Assembly mounting
Fig 3.3
NOTE: Portions of Carriage and Column cut away for clarity
NOTE: Column hidden for clarity
Power Side
Column de-
picted
Fig 3.4
Threaded cable
end from other
side of lift.
Cable routed up
and across Over-
head Assembly to
opposite carriage.
Fig 3.5
Elbow tting must
be turned towards
hose clips for hy-
draulic hose routing
Notice that
the hose clips
are offset for
hydraulic hose
routing
NOTE
FOR XPR-12CL/15CL/18CL-192 MODELS FIT
EXTENSION WELDMENTS TO POST ASSEMBLY
IN THIS STEP FOR EASE OF INSTALLATION
AND BOLT TOGETHER AS SHOWN ON PAGE 13
WITH M10 HARDWARE.