Product Manual

18
4. Insert the threaded end of the cable through the hole
on top of the carriage. Place M18 washer and M18 Nylock
nut on threaded cable end. Tighten cable nuts until taut,
checking that both cables have equal tension.
(See Fig 10.4)
XPR-12FDL Equalizer Cable Routing
Fig 10.3
From
base
plate
sheave
To lift
head
carriage
NOTE: Column cut away for clarity
Threaded cable
end comes down
from Top Plate
sheave and into
hole on top of car-
riage plate.
Threaded
Cable End
Nylock
Nut
Fig. 10.4
NOTE: Column cut away for clarity
THE EQUALIZER CABLE SHEAVES WILL NEED TO
BE REMOVED TO EASE THE ROUTING OF THE
EQUALIZER CABLES. BE SURE TO REINSTALL ALL
PINS, COVERS, BOLTS AND CLIPS OR SERIOUS
DAMAGE OR INJURY MAY OCCUR.
WHEN THE CABLE ADJUSTING NUTS BOTTOM OUT ON
THE THREADED END OF THE CABLE CONNECTOR
AND THERE IS STILL SLACK IN THE CABLES, THE
CABLES HAVE STRETCHED BEYOND THE SAFE USEFUL
LENGTH AND NEED TO BE REPLACED WITH FACTORY
APPROVED CABLE ASSEMBLIES. DO NOT PLACE
WASHERS, SPACERS OR OTHER DEVICES TO
“SHORTEN” THE EFFECTIVE CABLE LENGTH AS DAMAGE
TO THE LIFT OR INJURY TO PERSONS MAY OCCUR.