Product Manual

15
2. From the Off Side Column insert the non-looped end
of the safety cable through the hole located to the right of
the Off Side safety weldment. (See Fig 8.3)
3. Route the cable over the sheave and route it towards
the baseplate safety sheave. (See Fig 8.4)
4. Route the cable through the baseplate’s safety sheave(s)
and across the oor towards the Power Side Column.
(See Fig 8.5 - 8.6)
5. Route the cable the same way as on the Power Side
going up the Column and over the safety cable sheave.
6. Route the cable over the top pin on the safety handle.
Insert the cable end through the hole on the threaded pin.
(See Fig 8.7)
Fig 8.3
Slip looped end
over bottom pin
Insert
non-looped end
of safety cable
through hole in
Column
Fig 8.4.
Route safety cable
over Off Side safety
sheave and down
towards Floorplate
NOTE: Column cut
away for clarity
Fig 8.5
Safety
Cable
NOTE: Column and carriage cut away for clarity
To Power Side Column
From Off Side Column
Fig 8.6
Safety
Cable
NOTE: Column and carriage cut away for clarity
Safety
Cable
Hairpin
Cotter
Off Side Safety
Weldment
Safety
Clevis
Pin
Torsion
Spring
Fig 8.2