Product Manual

P-9000LT/F Low-Rise Pit Lift 29 P/N 5900022Rev. A5 February 2019
To make connections to the Power Unit:
1. Remove the front cover of the Console if it is currently in place.
2. Locate the female (Molex™) connector on the Power Unit and attach it to the male connector that
comes from the controls on the Console.
This connection is made
the Console. Make sure to orient the two connectors correctly.
3. Have an electrician connect an appropriate power source to the Power Unit.
Refer to Wiring Diagram for proper wiring information. Your electrician needs to supply both a
power cord and an appropriate plug.
DANGER All wiring
must
be performed by a licensed, certified electrician. Do not perform
any
maintenance or installation on the lift without first making sure that main
electrical power has been disconnected from the lift and
cannot
be re-energized
until all procedures are complete.
Important electrical information:
Improper electrical installation can damage the Power Unit motor; this damage is not covered
under warranty.
Use a separate circuit breaker for each Power Unit.
Protect each circuit with a time-delay fuse or circuit breaker. For a 115 VAC, 1 phase circuit, use
a 15 amp or greater fuse. For a 230 VAC, 1 phase circuit, use a 25 amp or greater fuse.
4. Fill the Hydraulic Fluid reservoir.
The Power Unit’s Hydraulic Fluid reservoir must be filled with Hydraulic Fluid or automatic
transmission fluid
before
you begin operation. When you receive it, the reservoir is empty; the
Power Unit will not work correctly until it is filled with approved fluids.
Approved Hydraulic Fluids are any general purpose ISO-32, ISO-46, or ISO-68 hydraulic oil or
approved automatic transmission fluids such as Dexron III, Dexron VI, Mercon V, Mercon LV, Shell
Tellus S4 / S3 / S2, or any synthetic multi-vehicle automatic transmission fluid.
WARNING Do not run your Power Unit without Hydraulic Fluid; you will damage it.