To add Chalk Line Guides:
1. Decide where you want to locate the Lift.
2. Create an Alignment Chalk Line where you want one end of the P-9000LT.
Make the Alignment Chalk Line longer than the width of the P-9000LT and the Pit.
3. Move the two Frames into position: the Hinged Ramp ends just inside the Alignment Chalk Line
and the inside edges of the Frames aligned with the Pit.
The two Frames are not interchangeable; the Hydraulic Cylinders on the P-9000LT Bases need to
be on the inside, closer to the Pit.
Tip This procedure assumes you are installing the P-9000LT over a pit. If not, create two
additional Chalk Line Guides: they need to be perpendicular to the Alignment Chalk
Line, parallel to each other, and the distance apart you want the two Platforms (within
the range of 36" to 42" / 914 mm to 1,066 mm).
4. Measure the distance between the two P-9000LT Platforms at points a and b; the two Platforms
need to be the same distance apart at both ends.
Important: If a and b are not the same, adjust the Frames; a and b
must
be the same distance
apart and parallel to the Pit.
5. When the Platforms are in the correct location, they can be anchored into place.