Product Manual
P-9000LT/F Low-Rise Pit Lift 10 P/N 5900022 — Rev. A5 — February 2019
Installation Checklist
Following are the steps needed to install a P-9000LT/F Lift. Perform them in the order shown.
☐ 1. Review the installation Safety Rules.
☐ 2. Plan for Electrical Work.
☐ 3. Make sure you have the necessary Tools.
☐ 4. Select the Installation Site.
☐ 5. Make sure there is adequate clearance on all sides of the Lift.
☐ 6. Create the Concrete Cutouts (P-9000LTF only).
☐ 7. Create Chalk Line Guides.
☐ 8. Lift the Platforms off the Bases.
☐ 9. Anchor the Bases.
☐ 10. Set up the Console and attach the Power Unit.
☐ 11. Connect the Hydraulic Lines.
☐ 12. About Compression Fittings and Tubing.
☐ 13. Connect the Air Lines.
☐ 14. Connect the Power Unit.
☐ 15. Install a Power Disconnect Switch.
☐ 16. Install a Thermal Disconnect Switch.
☐ 17. Test the Lift.
☐ 18. Add the Ramps (P-9000LT only).
☐ 19. Review the Final Checklist.
☐ 20. Leave the Manual for the owner/operator.