Product Manual

18
4. Tighten each Nut until there is at least 2-3 threads
protruding through the top of the nut. The Cables will
remain loose until start up and nal Cable
adjustments are made. (See Fig. 8.4)
5. After routing the Cables double-check to make sure
all are properly positioned and remain within the grooves
of ALL Sheaves. (See Fig. 8.5 - 8.6)
STEP 9
(Power Unit Installation)
1. Mount the Power Unit to the Mounting Bracket using
the M8 Hex Head Bolts and Nylock Nuts then ll the
reservoir with 12 quarts of 10-WT hydraulic oil or Dexron
III automatic transmission uid. (See Fig. 9.1)
ALL WIRING MUST BE PERFORMED
BY A LICENSED ELECTRICIAN.
Fig 8.4
Fig 8.5
Fig 8.6
Fig 8.3
Fig 9.1
M8 Hex
Bolts
Flex Tube
Bracket
Vibration
Dampener
M8 Nylock
Nuts
Flat
Washers
DO NOT PERFORM ANY MAINTENANCE OR
INSTALLATION OF ANY COMPONENTS
WITHOUT FIRST ENSURING THAT ELECTRICAL
POWER HAS BEEN DISCONNECTED AT
THE SOURCE OR PANEL AND CANNOT BE
RE-ENERGIZED UNTIL ALL MAINTENANCE
AND/OR INSTALLATION
PROCEDURES ARE COMPLETED.