Product Manual
17
STEP 7
(Cable / Sheave Installation)
1. Inspect Cables to ensure proper lengths. All Cables
should have ID tags showing proper Cable lengths.
2. In order to install the Cables it is necessary to rst
extend the Hydraulic Cylinder. Remove both Cylinder port
plugs then use an air gun or come-along to extend the
Cylinder.
IMPORTANT! - Be careful not to damage the chrome rod
during this step. (See Fig. 7.1)
3. You must reinstall the Sheaves and Pins in the same
order as they are removed. (See Fig. 7.2)
STEP 8
(Cable Installation)
1. The Cylinder Flange Plate MUST be installed with the
Guide Assembly facing down, the welded on Spacer
towards the Cylinder and the Cylinder Retainer plate on
the outside of the guide. Lug ends of Cables start at
Cylinder. (See Fig. 8.1)
2. Route the threaded Cable ends through the ends of
each Crosstube. Care must be taken when routing the
Lifting Cables to ensure they are routed below the
Crosstube Mounting Bolts. (See Fig 8.2)
3. Route Cables over the Slack Safety Sheaves then to
the top of each Column. Secure using the M18 Hex Head
Nuts and Flat Washers. (See Fig. 8.3)
DO NOT PROCEED unless visual conrmation
is made of ALL Safety Locks. ALL locks MUST
be engaged before proceeding. Failure to
comply with these instructions may result in
severe personal injury or death. (See page 11.)
Failure to route Lifting Cables as described may lead to
serious personal injury and/or death to operator or
bystander and/or may cause damage to property.
Fig 7.1
Fig 7.2
Fig 8.1
Fig 8.2