Use and Care Manual

Table Of Contents
HD-9 Series Four-Post Lifts 60 P/N 5900123Rev. M1 March 2020
Once past the hole in the Base Plate, the Anchor Bolt eventually stops going down into the hole as
the Expansion Sleeve contacts the sides of the hole; this is normal.
6. Hammer or mallet the Anchor Bolt the rest of the way down into the hole.
Stop when the Washer is snug against the Base Plate.
7. Plumb each Post; install any needed Shims.
Do not shim a Post more than half an inch using the provided Shims. A maximum of 2 inches is
possible by ordering optional Shim Plates. Contact BendPak at (800) 253-2363, extension 191
to order. Please have the model and serial number of your Lift available.
Take your time while plumbing and shimming the Posts;
it is important to make the Lift
level as possible
.
8. Wrench each Nut
clockwise
to the recommended installation torque, 85-95 pound feet, using a
Torque Wrench.
Important: Do
not
use an impact wrench to torque the Anchor Bolts.
Wrenching the Nut forces the Wedge up, forcing out the Expansion Sleeve and pressing it tightly
against the Concrete.