Use and Care Manual
Table Of Contents
- HD-9 Manual
- Table of Contents
- Introduction
- Shipping Information
- Safety Considerations
- Components
- Specifications
- Frequently Asked Questions
- Installation Checklist
- Installation
- Being Safe
- Using Tools
- Planning for Electrical Work
- Selecting a Location
- Checking Clearances
- Deciding the Lift Orientation
- Creating Chalk Line Guides
- Unloading and Unpacking
- Moving the Posts into Position
- Installing the Crosstubes
- About Safety Locks
- Installing the Ladders and Top Cap
- Raising the Crosstubes
- Securing the Ladders
- Removing the Sheaves
- Installing the Runways
- Installing the First End of the Flex Tube
- Routing the Lifting Cables
- Working with Compression Fittings and Tubing
- Installing the Air Lines
- Installing the Return Line
- Hydraulic Fluid Contamination
- About Thread Sealants
- Installing the Hydraulic Hose
- Installing the Power Unit
- Filling the Hydraulic Fluid Reservoir
- Installing the Second End of the Flex Tube
- Installing the Pushbutton Air Valve
- Connecting the Return Line
- Connecting the Hydraulic Hose
- Contacting the Electrician
- Connecting the Power Source
- Installing a Power Disconnect Switch
- Installing a Thermal Disconnect Switch
- About Effective Embedment
- Anchoring the Posts
- Final Leveling
- Installing Accessories
- Lubricating the Lift
- Bleeding the Hydraulic Cylinder
- Test the Lift
- Final Checklist
- Outdoor usage
- Operation
- Maintenance
- Troubleshooting
- Wiring Diagrams
- Labels
- Parts Drawings
- Automotive Lift Institute (ALI) Store
HD-9 Series Four-Post Lifts 30 P/N 5900123 — Rev. M1 — March 2020
Use a Forklift or Shop Crane to raise the Runways and move them into position.
⚠ WARNING Pay close attention when moving the Runways into position; they are very heavy
and long, and could shift position or fall, potentially causing serious injury.
To install the Runways:
1. Correctly orient the Powerside Runway and the Offside Runway.
The Powerside Post must go next to the Power Post.
2. On the underside of the Powerside Runway, make sure the Sheaves have been removed.
3. Use a Forklift or Shop Crane to pick up the Powerside Runway and move it into place.
Make sure the Utility Rail is on the inside.
4. Bolt the Powerside Runway into place, two Bolts on each end going into the Crosstubes.
Use four M12 by 1.75 by 90 Hex Head Bolts.
5. Use a Forklift or Shop Crane to pick up the Offside Runway and move it into place.
6. Bolt the Offside Runway into place, two Bolts on each end going into the Crosstubes.
Make sure the Utility Rail is on the inside.
Important: The Offside Runway
must
be bolted on both ends when using the optional Rolling
Jack.
7. Make sure that the Primary Locks are engaged.
⚠ WARNING Do not continue with the installation until you have visually confirmed that all four
Safety Locks are engaged. If they are not engaged, the Runways could move or
fall, possibly causing personal injury or product damage.
8. Locate the Runway Strap from the Parts Box.
The Runway Strap is approximately 19 inches (472 mm) long and about 2 inches (50 mm) wide,
with a hole on either end of the Strap.
9. Align the holes on the Runway Strap with the holes underneath the Offside Runway, and then
secure it in place with a Bolt, Washer, and Nut.