Use and Care Manual

Table Of Contents
HD-9 Series Four-Post Lifts 12 P/N 5900123Rev. M1 March 2020
Installation Checklist
Following are the steps needed to install your Lift. Perform them in the order shown.
1. Review the safety rules.
2. Make sure you have the necessary tools.
3. Plan for Electrical work.
4. Select the installation location.
5. Check the Clearances.
6. Decide the Lift Orientation.
7. Unload and unpack the Lift components.
8. Create Chalk Line Guides.
9. Move the Posts into position.
10. Install the Crosstubes.
11. About Safety Locks.
12. Install the Ladders and Top Caps.
13. Raise the Crosstubes.
14. Secure the Ladders.
15. Removing the Sheaves.
16. Install the Runways.
17. Route the Lifting Cables.
18. Working with Compression Fittings and Tubing.
19. Install the Air Line.
20. Install the Return Line.
21. About Hydraulic Contamination.
22. About Thread Sealants.
23. Install the Hydraulic Hose.
24. Install the Power Unit.
25. Install the Flex Tube Bracket Plate and Angle Plate.
26. Install the Flex Tube.
27. Install the Pushbutton Air Valve and connect the Air Lines.
28. Connect the Return Line.
29. Connect the Hydraulic Hose.
30. Contact the Electrician.
31. Connect to a power source (
Electrician required
).
32. Install the Power Disconnect Switch and Thermal Disconnect Switch (
Electrician required
).
33. About Effective Embedment.
34. Anchor the Posts.
35. Perform final leveling.
36. Install the Accessories.
37. Lubricate the Lift.
38. Test the Lift.
39. Review the final checklist.
40. Outdoor usage.