Product Brochure
Table Of Contents
- HD-7P and HD-7W Manual
- Table of Contents
- Introduction
- Shipping Information
- Safety Considerations
- Components
- Specifications
- Frequently Asked Questions
- Installation Checklist
- Installation
- Being Safe
- Tools
- Planning for Electrical Work
- Selecting an Approach Direction
- Selecting a Power Post Location
- Checking Clearances
- Selecting a Location
- Unloading and Unpacking
- Creating Chalk Line Guides
- Moving the Posts into Position
- Installing the Crosstubes
- About Safety Locks
- Installing the Ladders and Top Cap
- Raising the Crosstubes
- Securing the Ladders
- Removing Sheaves
- Installing the Runways
- Installing the First End of the Flex Tube
- Routing the Lifting Cables
- Working with Compression Fittings and Tubing
- Installing the Air Lines
- Installing the Hydraulic Hose
- Installing the Return Line
- Installing the Power Unit
- Filling the Hydraulic Fluid Reservoir
- Installing the Second End of the Flex Tube
- Installing the Pushbutton Air Valve
- Connecting the Return Line
- Connecting the Hydraulic Hose
- Contacting the Electrician
- Connecting to a Power Source
- Installing a Power Disconnect Switch
- Installing a Thermal Disconnect Switch
- About Effective Embedment
- Anchoring the Posts
- Final Leveling
- Installing Accessories
- Lubricating the Lift
- Performing an Operational Test
- Reviewing the Final Checklist
- Operation
- Maintenance
- Troubleshooting
- Wiring Diagrams
- Labels
- Parts Drawings
- Automotive Lift Institute (ALI) Store
- Maintenance Log
HD-7P / HD-7W Four-Post Lifts 56 P/N 5900041 — Rev. M — July 2019
Contacting the Electrician
As mentioned previously, there are installation tasks that
require
a certified Electrician.
⚠ DANGER All wiring
must
be performed by a licensed, certified Electrician.
The Electrician needs to:
• Connect the Power Unit to an appropriate power source. A power source is required.
Refer to Connecting to a Power Source for more information.
• Install a Power Disconnect Switch. Ensures you can quickly and completely interrupt
electrical power to the Lift in the event of an electrical circuit fault, emergency situation, or when
equipment is undergoing service or maintenance. You must put it within sight and easy reach of
the Lift operator. Refer to Install a Power Disconnect Switch for more information.
• Install a Thermal Disconnect Switch. Ensures the equipment shuts down in the event of an
overload or an overheated motor. Refer to Install a Thermal Disconnect Switch for more
information. Note that the Power Unit that comes with the Lift is
not
thermally protected.
The electrician is responsible for providing:
• an appropriate cable and plug to attach to the Power Unit, for connection to a wall outlet
or
an
appropriate cable that attaches the Power Unit to the facility’s electrical system
• a Power Disconnect Switch
• a Thermal Disconnect Switch
Refer to Wiring Diagrams for wiring information for your Lift’s Power Unit.
Additional information is supplied in the sections describing these tasks.










