Product Brochure
Table Of Contents
- HD-7P and HD-7W Manual
- Table of Contents
- Introduction
- Shipping Information
- Safety Considerations
- Components
- Specifications
- Frequently Asked Questions
- Installation Checklist
- Installation
- Being Safe
- Tools
- Planning for Electrical Work
- Selecting an Approach Direction
- Selecting a Power Post Location
- Checking Clearances
- Selecting a Location
- Unloading and Unpacking
- Creating Chalk Line Guides
- Moving the Posts into Position
- Installing the Crosstubes
- About Safety Locks
- Installing the Ladders and Top Cap
- Raising the Crosstubes
- Securing the Ladders
- Removing Sheaves
- Installing the Runways
- Installing the First End of the Flex Tube
- Routing the Lifting Cables
- Working with Compression Fittings and Tubing
- Installing the Air Lines
- Installing the Hydraulic Hose
- Installing the Return Line
- Installing the Power Unit
- Filling the Hydraulic Fluid Reservoir
- Installing the Second End of the Flex Tube
- Installing the Pushbutton Air Valve
- Connecting the Return Line
- Connecting the Hydraulic Hose
- Contacting the Electrician
- Connecting to a Power Source
- Installing a Power Disconnect Switch
- Installing a Thermal Disconnect Switch
- About Effective Embedment
- Anchoring the Posts
- Final Leveling
- Installing Accessories
- Lubricating the Lift
- Performing an Operational Test
- Reviewing the Final Checklist
- Operation
- Maintenance
- Troubleshooting
- Wiring Diagrams
- Labels
- Parts Drawings
- Automotive Lift Institute (ALI) Store
- Maintenance Log
HD-7P / HD-7W Four-Post Lifts 47 P/N 5900041 — Rev. M — July 2019
Installing the Power Unit
This section describes how to
install
, but not make the connections to, the Power Unit for your Lift.
An Electrician is
not
needed to install the Power Unit; however, an Electrician
is
required to connect
the Power Unit to its power source.
The Power Unit
must
be installed on the Power Post: attach it to one of the two Mounting Brackets,
whichever is more convenient for the location.
Important: Many people install the Flex Tube Bracket Plate and/or the Zero Angle Bracket at the
same time as they install the Power Unit. Read Installing the Second End of the
Flex Tube and Installing the Pushbutton Air Valve for more information to see
if this makes sense for your installation.
⚠ DANGER Risk of explosion: The Power Unit has internal arcing or parts that may spark and
should not be exposed to flammable vapors. Never expose the Power Unit motor
to rain or other damp environments. Damage to the motor caused by water is
not
covered by the warranty.
Tip The Power Unit is heavy. BendPak recommends having one person hold the Power Unit
while another person bolts it into place.
To install the Power Unit:
1. Find the four supplied Hex Head Bolts, Flat Washers, Nyloc Nuts, and the Vibration Dampener.
2. Line up the holes on the Vibration Dampener with the four holes in the Mounting Bracket.
3. If you are going to install the Flex Tube Bracket Plate and/or the Zero Angle Bracket at the same
time as the Power Unit, now is the time to put them into place.
4. Put a Flat Washer onto each of the four Hex Head Bolts, slide the Bolts through the back of the
Mounting Bracket and through the holes in the Vibration Dampener.
5. Have the second person lift the Power Unit and slide the holes in the Back Plate of the Power Unit
over the Bolts that are coming out of the Vibration Dampener.
6. Put on the Nyloc Nuts to secure the Power Unit in place.










