Product Brochure
Table Of Contents
- HD-7P and HD-7W Manual
- Table of Contents
- Introduction
- Shipping Information
- Safety Considerations
- Components
- Specifications
- Frequently Asked Questions
- Installation Checklist
- Installation
- Being Safe
- Tools
- Planning for Electrical Work
- Selecting an Approach Direction
- Selecting a Power Post Location
- Checking Clearances
- Selecting a Location
- Unloading and Unpacking
- Creating Chalk Line Guides
- Moving the Posts into Position
- Installing the Crosstubes
- About Safety Locks
- Installing the Ladders and Top Cap
- Raising the Crosstubes
- Securing the Ladders
- Removing Sheaves
- Installing the Runways
- Installing the First End of the Flex Tube
- Routing the Lifting Cables
- Working with Compression Fittings and Tubing
- Installing the Air Lines
- Installing the Hydraulic Hose
- Installing the Return Line
- Installing the Power Unit
- Filling the Hydraulic Fluid Reservoir
- Installing the Second End of the Flex Tube
- Installing the Pushbutton Air Valve
- Connecting the Return Line
- Connecting the Hydraulic Hose
- Contacting the Electrician
- Connecting to a Power Source
- Installing a Power Disconnect Switch
- Installing a Thermal Disconnect Switch
- About Effective Embedment
- Anchoring the Posts
- Final Leveling
- Installing Accessories
- Lubricating the Lift
- Performing an Operational Test
- Reviewing the Final Checklist
- Operation
- Maintenance
- Troubleshooting
- Wiring Diagrams
- Labels
- Parts Drawings
- Automotive Lift Institute (ALI) Store
- Maintenance Log
HD-7P / HD-7W Four-Post Lifts 13 P/N 5900041 — Rev. M — July 2019
Planning for Electrical Work
You will need to have a licensed, certified Electrician available at some point during the installation.
⚠ DANGER All electrical work
must
be performed by a licensed, certified Electrician.
Notify your Electrician in advance so that they come prepared with appropriate components for
connecting to the power source, a Power Disconnect Switch, and a Thermal Disconnect Switch. Refer
to Contacting the Electrician for more information.
Your Electrician needs to:
• Connect the Power Unit to an electric power source. An electric power source is
required. The Power Unit comes with a Pigtail for wiring to a power source. Have your Electrician
connect a power cord with appropriate plug to the electrical box on the Lift (for connection to a
power outlet) or have them wire it directly into the electrical system at the Lift location.
Note that installing the Power Unit and connecting the Power Unit to the power source are
separate procedures and are done at different times in the installation process. You do
not
need
an Electrician to install the Power Unit, but an Electrician is
required
to connect the Power Unit to
the power source.
• Install a Power Disconnect Switch. Ensures you can quickly and completely interrupt
electrical power to the Lift in the event of an electrical circuit fault, emergency situation, or when
equipment is undergoing service or maintenance. Put it within sight and reach of the Lift operator.
• Install a Thermal Disconnect Switch. Ensures the equipment shuts down in the event of an
overload or an overheated motor.
Note: These components are not supplied with the Lift.










