Product Brochure
Table Of Contents
- HD-7P and HD-7W Manual
- Table of Contents
- Introduction
- Shipping Information
- Safety Considerations
- Components
- Specifications
- Frequently Asked Questions
- Installation Checklist
- Installation
- Being Safe
- Tools
- Planning for Electrical Work
- Selecting an Approach Direction
- Selecting a Power Post Location
- Checking Clearances
- Selecting a Location
- Unloading and Unpacking
- Creating Chalk Line Guides
- Moving the Posts into Position
- Installing the Crosstubes
- About Safety Locks
- Installing the Ladders and Top Cap
- Raising the Crosstubes
- Securing the Ladders
- Removing Sheaves
- Installing the Runways
- Installing the First End of the Flex Tube
- Routing the Lifting Cables
- Working with Compression Fittings and Tubing
- Installing the Air Lines
- Installing the Hydraulic Hose
- Installing the Return Line
- Installing the Power Unit
- Filling the Hydraulic Fluid Reservoir
- Installing the Second End of the Flex Tube
- Installing the Pushbutton Air Valve
- Connecting the Return Line
- Connecting the Hydraulic Hose
- Contacting the Electrician
- Connecting to a Power Source
- Installing a Power Disconnect Switch
- Installing a Thermal Disconnect Switch
- About Effective Embedment
- Anchoring the Posts
- Final Leveling
- Installing Accessories
- Lubricating the Lift
- Performing an Operational Test
- Reviewing the Final Checklist
- Operation
- Maintenance
- Troubleshooting
- Wiring Diagrams
- Labels
- Parts Drawings
- Automotive Lift Institute (ALI) Store
- Maintenance Log
HD-7P / HD-7W Four-Post Lifts 11 P/N 5900041 — Rev. M — July 2019
Installation Checklist
Following are the steps needed to install your Lift. Perform them in the order shown.
☐ 1. Review the Safety Rules.
☐ 2. Make sure you have the necessary Tools.
☐ 3. Plan for electrical work.
☐ 4. Select an Approach.
☐ 5. Choose a Power Post Location.
☐ 6. Check the Clearances.
☐ 7. Select the Installation Location.
☐ 8. Unload and unpack the Lift Components.
☐ 9. Create Chalk Line Guides.
☐ 10. Move the Posts into position.
☐ 11. Install the Crosstubes.
☐ 12. About Safety Locks.
☐ 13. Install the Ladders and Top Caps.
☐ 14. Raise the Crosstubes.
☐ 15. Secure the Ladders.
☐ 16. Remove the Sheaves.
☐ 17. Install the Runways.
☐ 18. Install the first end of the Flex Tube.
☐ 19. Route the Lifting Cables.
☐ 20. Working with Compression Fittings and Tubing.
☐ 21. Install the Air Lines.
☐ 22. Install the Hydraulic Hose.
☐ 23. Install the Return Line.
☐ 24. Install the Power Unit.
☐ 25. Install the second end of the Flex Tube.
☐ 26. Install the Pushbutton Air Valve and connect the Air Line.
☐ 27. Connect the Return Line.
☐ 28. Connect the Hydraulic Hose.
☐ 29. Contact the Electrician.
☐ 30. Connect to a power source (
Electrician required
).
☐ 31. Install the Power Disconnect Switch and Thermal Disconnect Switch (
Electrician required
).
☐ 32. About Effective Embedment.
☐ 33. Anchor the Posts.
☐ 34. Perform final leveling.
☐ 35. Install the Accessories.
☐ 36. Lubricate the Lift.
☐ 37. Perform an Operational Test.
☐ 38. Review the Final Checklist.