Use and Care Manual
Table Of Contents
- Table of Contents
- Introduction
- Shipping Information
- Safety Considerations
- Components
- Specifications
- Installation Checklist
- Installation
- Reviewing the Safety Rules
- Gathering Your Tools
- Preparing for Electrical Work
- Reviewing the Installation Orientation
- Checking Clearances
- Selecting a Location
- Choosing a Wide or Narrow Configuration
- Installing the Safety Assemblies and Positioning the Safety Lock Cable
- Putting the Equalizing Cables into Position
- About Thread Sealants
- Identifying Hydraulic Fittings
- Routing the Hydraulic Hoses
- Creating Chalk Line Guides
- Anchoring the Posts
- Installing the Overhead Assembly and Safety Shutoff Bar
- Installing the Microswitch
- Completing the Equalizing Cables Installation
- Mounting the Power Unit
- Installing the Safety Lock Cable
- Connecting the Hydraulic Hoses
- Installing the Lift Arms
- Double Threaded Rod Installation
- Leveling
- Contact the Electrician
- Electrical Information
- Wiring the Microswitch
- Connecting the Power Unit
- Installing a Power Disconnect Switch
- Installing a Thermal Disconnect Switch
- Lubricating the Lift
- Review Final Checklist Before Operation
- Leave the Manual with the Owner/Operator
- Perform an Operational Test
- Operation
- Maintenance
- Troubleshooting
- Wiring Diagrams
- Labels
- Parts Drawings
- Automotive Lift Institute (ALI) Store
- Maintenance Log
- Maintenance Log
10AP Series Two-Post Lifts 49 P/N 5900265 — Rev. A10 — September 2023
⚠ WARNING Make sure that the Arm Restraint Gears and the Gear Stops are meshing and
staying in place when up to 150 pounds of lateral force is applied before putting the
Lift into normal operation.
⚠ DANGER Each Lift Arm Assembly must be inspected and adjusted as required before each
use. Do not operate the Lift if any of the four Lift Arm restraint systems are not
functioning correctly. Replace any damaged components with approved
replacement parts.
Double Threaded Rod Installation
The Double Threaded Rods (5746167) as shown below, must be installed with M10 flat washers
(5545341) and M10 x 1.5 Hex Nuts (5535013) on each Lift Post. Torque the Hex Nuts to 2-3 ft. lb.
Hydraulic Hoses are to be routed over the Tie Rods.
⚠ WARNING The Double Threaded Rods must be installed to ensure proper operation of the Lift.










