Use and Care Manual
Table Of Contents
- Table of Contents
- Introduction
- Shipping Information
- Safety Considerations
- Components
- Specifications
- Installation Checklist
- Installation
- Reviewing the Safety Rules
- Gathering Your Tools
- Preparing for Electrical Work
- Reviewing the Installation Orientation
- Checking Clearances
- Selecting a Location
- Choosing a Wide or Narrow Configuration
- Installing the Safety Assemblies and Positioning the Safety Lock Cable
- Putting the Equalizing Cables into Position
- About Thread Sealants
- Identifying Hydraulic Fittings
- Routing the Hydraulic Hoses
- Creating Chalk Line Guides
- Anchoring the Posts
- Installing the Overhead Assembly and Safety Shutoff Bar
- Installing the Microswitch
- Completing the Equalizing Cables Installation
- Mounting the Power Unit
- Installing the Safety Lock Cable
- Connecting the Hydraulic Hoses
- Installing the Lift Arms
- Double Threaded Rod Installation
- Leveling
- Contact the Electrician
- Electrical Information
- Wiring the Microswitch
- Connecting the Power Unit
- Installing a Power Disconnect Switch
- Installing a Thermal Disconnect Switch
- Lubricating the Lift
- Review Final Checklist Before Operation
- Leave the Manual with the Owner/Operator
- Perform an Operational Test
- Operation
- Maintenance
- Troubleshooting
- Wiring Diagrams
- Labels
- Parts Drawings
- Automotive Lift Institute (ALI) Store
- Maintenance Log
- Maintenance Log
10AP Series Two-Post Lifts 44 P/N 5900265 — Rev. A10 — September 2023
Connecting the Hydraulic Hoses
Some of the Hydraulic Hoses were put into place much earlier in the installation. It is now time to finish
installing the Hydraulic Hoses and connect them to the Power Unit.
If they were not put into position earlier, you must do so now, before beginning the following
procedure. Refer to Routing the Hydraulic Hoses for full instructions.
The following illustration shows how to connect the Hydraulic Hoses in both Lift configurations.
Drawing shows side of Powerside Post. Not drawn to scale. Not all components shown.
To finish connecting the Hydraulic Hoses:
Locate the Ø10mm Short Hydraulic Hose and the remaining Elbow ORB Hydraulic Fitting
(5550183).
On the Power Unit, locate a Hydraulic Pressure Port on the Power Unit (labeled P, P1, or P2),
remove the shipping plug, and then install the Elbow Hydraulic Fitting. Place a few drops of
hydraulic fluid on the O-ring before installing on the Power Unit.
See the drawing on the following page for possible Hydraulic Pressure Port locations.
Note: There are multiple Ports on the Power Units that are used with 10AP Series Lifts. However,
each 10AP Series Lift uses only one Hydraulic Pressure Port (labeled P in the drawing










