Use and Care Manual
Table Of Contents
- Table of Contents
- Introduction
- Shipping Information
- Safety Considerations
- Components
- Specifications
- Installation Checklist
- Installation
- Reviewing the Safety Rules
- Gathering Your Tools
- Preparing for Electrical Work
- Reviewing the Installation Orientation
- Checking Clearances
- Selecting a Location
- Choosing a Wide or Narrow Configuration
- Installing the Safety Assemblies and Positioning the Safety Lock Cable
- Putting the Equalizing Cables into Position
- About Thread Sealants
- Identifying Hydraulic Fittings
- Routing the Hydraulic Hoses
- Creating Chalk Line Guides
- Anchoring the Posts
- Installing the Overhead Assembly and Safety Shutoff Bar
- Installing the Microswitch
- Completing the Equalizing Cables Installation
- Mounting the Power Unit
- Installing the Safety Lock Cable
- Connecting the Hydraulic Hoses
- Installing the Lift Arms
- Double Threaded Rod Installation
- Leveling
- Contact the Electrician
- Electrical Information
- Wiring the Microswitch
- Connecting the Power Unit
- Installing a Power Disconnect Switch
- Installing a Thermal Disconnect Switch
- Lubricating the Lift
- Review Final Checklist Before Operation
- Leave the Manual with the Owner/Operator
- Perform an Operational Test
- Operation
- Maintenance
- Troubleshooting
- Wiring Diagrams
- Labels
- Parts Drawings
- Automotive Lift Institute (ALI) Store
- Maintenance Log
- Maintenance Log
10AP Series Two-Post Lifts 20 P/N 5900265 — Rev. A10 — September 2023
Reference only – do not scale.
Locate the Safety Lock Cable. This is a long, thin Wire Rope Cable with a Button swaged onto one
end and nothing on the other end. Thread the cable through the Offside Safety Block as shown
above. Part Number and Cable length varies based on Lift Model.
Model Part Number Safety Cable
Dia. and Length
10AP 5595793 Ø1.8 x 7,773 mm
10AP-168 5595831 Ø1.8 x 8,865 mm
10APX 5595832 Ø1.8 x 8,103 mm
10AP-181 5595833 Ø1.8 x 9,322 mm
Thread the remainder of the Safety Lock Cable under the Safety Cable Sheave and Lift Head, then
up to the top of the Offside Post. Coil the cable and secure with tape or a Zip Tie at
the top of the Offside Lift Post until called for later in the assembly.