Manual

10
FIGURE 8 - BENDIX
®
AD-IP
®
AIR DRYER INTERNAL COMPONENTS – HORIZONTAL DELIVERY CHECK VALVE
11
12
13
17
10
4
6
5
1
2219
20
21
14
18
15
7
3
8
23 24 25
2
DISCHARGE LINE
UNLOADED (DLU)
STYLE PURGE VALVE
16
9
15
STANDARD
STYLE PURGE
VALVE
14
18
*16
INSTALLATION RING -
(NOTE THE ORIENTATION
OF THE BEVEL OF THE RING
BEFORE INSTALLATION.)
SLIDE INSTALLATION
RING INTO PURGE
BORE
APPLY LUBRICANT
TO INSIDE
SURFACE
*Most OE installed Bendix
®
AD-IP
®
air dryers manufactured after January 1, 2014 will not be equipped with
a purge valve installation ring (16). The function of the installation ring has been incorporated into the air
dryer lower housing. Be sure to replace the installation ring if it was removed during servicing procedures.