Specifications
5
Telephone: 01604 762881
5
FIGURE 1
USER CONTROL PANEL
Central Heating Water 
Temperature Control (P1)
Domestic Hot Water 
Temperature Control (P2)
Power ON/OFF Switch
Space for optional programmer
Reset Button
Pre-Heat Button
4. INITIAL LIGHTING
  If turning on the boiler for the first time carry out the following steps:
  Check that the electrical supply to the boiler is ON at the     
 external isolator.
  Ensure all hot taps are closed.
  Set any remote controls as required.
  Turn the CH and DHW controls to the minimum setting. Switch on   
  the appliance at the on/off switch on the control panel. The boiler   
  will then be in the STANDBY mode.
  
Check the heating system pressure displayed in the RH lower   
  corner of the display. This should read at least 1.0 bar. A sealed   
  pressurised system must be filled by a competent person.
  Only operate the boiler when you are sure that the system has been filled 
and pressurised. If you are in any doubt about the boiler being filled with 
water contact your installer.
3. CONTROL PANEL
  The flip door at the bottom of the boiler is held in the closed 
position. To gain access to the control panel, take hold of the side of 
the panel at the corners and pull towards you, allowing the door to 
drop into the open position.
  To close the flip door, lift up the panel and push shut until it clicks 
into place.
1.0
 bar










