Instruction manual

PARC
PARCPARC
PARC
PARC
PARCPARC
PARC
MOW
MOW MOW
MOW
MOW
MOW MOW
MOW
-
--
-
-
--
-
BIG
BIGBIG
BIG
BIG
BIGBIG
BIG
MOW
MOW MOW
MOW
MOW
MOW MOW
MOW
During set-up:
1. Place a 1.5 mm² single strand wire in a sheath along the terrain border. Use thermo
retractable crimp-on connectors with resin.
The cable is positioned between 2 and 5 cm
deep.
2. Maximum 1000 metres of peripheral wire.
3. Avoid the creation of bottlenecks in the area where the machine moves around.
4. Avoid including an additional area in the work area by a very narrow passage (width of
passage: min 5 metres).
5. Do not leave major irregularities in the terrain (hollows or bumps). Spread sand on the
irregular area.
6. The edges of the terrain, delimited by trees or hedgerows must be mowed.
7. Shrubs do not stop the machine, protect them with a ‘rigid physical’ protection (allow ob-
stacles of a minimum 40 cm high areas of a maximum 50 cm); remove or protect obsta-
cles of less than 15 cm in height on the terrain
.
8. Limit yourself to 5 islands in the working area.
9. Do not place a peripheral wire perpendicular to a steep slope line of more than 15%,
(even at the bottom of a slope). Leave a minimum of 1 metre flat.
10. Terrains that are too marshy, not drained, with an accumulation of water at certain peri-
ods and/or certain locations must be adapted by effective drainage.
11. Collect the grass before using machine on a terrain for the first time.
12. Do not place an obstacle at less than 2 metres from the layout of the wire when it by-
passes an island (to avoid obstacles on the return to the station).
13. Place the station in an area where there are no obstacles near the wire, leave the wire
accesses open (on 10 metres before and after the station). The station must be set up
in the largest space in the mowing area, and do not set it up in a secluded location or in a
secondary area. Insert the peripheral wires and the power supply wire underneath the
station via holes of a size equal to the diameter of the sheaths.
14. The station must be positioned on a flat surface of min. 2 metres in front of the station
arm. In addition it must have the straightest line possible for 3 metres on both sides of
the station (a slight curve without a break is acceptable) BUT a completely straight line
for 1 metre on both sides of the station is mandatory.
15.Connect the station in accordance with the current guidelines (terminal protected by differen-
tial for the exterior, buried cable…).
16. Protect water features or areas at risk.
17. Keep 15 metres around the station without obstacle.
18. Two stations must be at least 30 metres apart (2*15 m).
19. Protect areas at risk (pond, lake, swimming pool, path…) by a physical obstacle.
20.You can coordinate the automatic sprinklers with the station load arm via an optional ac-
cessory (contactor).
PAGE 24
Important points to verify
Important points to verify Important points to verify
Important points to verify (1)
(1)(1)
(1)