Installation Guide
  4 
Installation
1 
Preparing for installation
CAUTION: Always turn off the water supply before 
removing an existing faucet or replacing any part of a 
faucet. Open the faucet handle to relieve water pressure 
and ensure that the water is completely shut off.
2 
Removing the protective cap
 □ Remove the protective cap (E). Loosen the 
connector (F) from the middle body (G). Adjust 
the rubber washer (H), metal washer (I) and 
mounting nut (J) to the bottom of middle body (G). 
 □ Shut off the water supply. Remove the old 
faucet.
 □ Clean the mounting surface.
 □ Drill 1-3/8 in. holes in the nished deck as
shown in the diagram below.
5 in. min.
8~16 in.
3 in. min.
1-1/4 in. MAX. DECK THICKNESS
1-3/8 in. 
Diamter
1-1/8 in. 
Diamter
1-3/8 in. 
Diamter
NOTE: This kit allows up to 1-1/4 in. deck thickness.
E
F
G
H
I
J
F
H
I
J
G
3 
Installing the middle body
 □ From underneath the deck, insert the middle 
body (G) with the rubber washer (H), metal 
washer (I) and mounting nut (J) through the 
mounting hole.
 □ From above, thread the connector (F) onto 
the middle body (G).
 □ Tighten the mounting nut (J) using a basin 
wrench, so that the connector (F) sits ush 
against the nished deck surface. 










