Instructions / Assembly
A
C
D
B
E
The gap between each pre-drilled 
hole is 16”.
Door height is H.
The height of holes on the wall 
is H+1/”.
Distance from the bottom of the door 
to the floor is /”.
Distance from door top side to holes on 
the wall is 1/”.
           
           
1/”
H+1/”
B
A
E
⁄”
C
H
D
 16”  16”  16”  16”
It is very important to determine whether you 
will be installing a Header Board prior to 
installing the track. 
Due to many overlapping factors such as the 
location of wall studs (Our rail come with 
pre-drilled holes every 16” on center), the 
weight of a barn door and the various types 
of trim used in homes, we recommend using 
a Header Board in all situations. 
Please install a 1”x4” or 1”x6” Header Board 
above the door opening directly into studs. 
Header Board must be solid wood and 
measure at least the full length of the track 
or longer.
H+1/”
* Header Board and 
Lag Bolts for installing 
Header Board are not 
included in kit.
A
A
AA
Concrete wall Installation.
Install the anchor to holes on the 
concrete wall first, then install lag 
bolt to anchor.
We provide 2 kinds of screws for you to 
install rail onto concrete wall or drywall.
    
    
Place the rail against the wall, and use a 
pencil to mark where the holes should be.
Make sure the height of holes on the wall 
is H+1/”. 
Connect two rails together (If the rail is 
one piece please skip this step).
1.1
1.2
Level can make the 
rail horizontal. 
3 4
B
Drywall Installation.
Install the lag bolt to wood stud or 
head board directly. 
B






