Installation Guide
2
1
1.Place the spout into center hole(The hole diameter
should be 1-3/8”) of the sink.Under sink,secure ÿrmly
to sink with rubber washer(17),metal washer(16) and
nut(15).
2.Insert the valve body assembly with the hot supply 
label is on the left (hot) side.Hold the body in the proper
position.Assemble metal washer(10) and mounting nut(11) 
onto body underside of sink,tighten it with the locking 
screws.
Faucet Installation
1
2
3.Align the blocks (1,2,3) and tabs (A,B,C) on the quick 
connects (K).Push the quick connects (K) ÿrmly upward 
and snap onto the blocks (1,2,3).Pull down moderately 
to ensure each connection has been made.If it is 
necessary to remove the X-over hose,press on the 
tabs (A,B,C) and pull the quick connects (K) .
4A.Stainess steel braided faucet supply tubes:
This the simplest of all installations.If you are using 
stainless steel braided faucet supply tubes,this faucet 
requires one end of the supply tube to have a 1/2” female 
IPS connection.The other end of this supply tube must 
match the thread on the water supply ÿttings or shut o° 
valve under your sink.Once you have identiÿed the 
required tube,carefully follow the manufacturer's
installations instructions for each tube.
4B.Ball Nose Flexible Supplies: If you are using ball-nose 
˜exible supplies to connect the faucet to water supply lines;
Slip coupling nut behind ball-nose of ˜exible supply tube.
Ball nose coupling will go partially into IPS shank or ÿtting.
Tighten coupling nut (Do Not Overtighten).
lnstall opposite end according to manufacturer's instructions 
for both tubes. 
3 4A
4B
17
16
15
10
11
Hot
Hot
Cold
A
1
2
3
B
C
K




