Installation Guide
15
Pic. 4.2
Dry fit the Opposite Wall Design Strip (DS) making sure the top of the DS aligns to the top of the line
drawn on the wall and to the lines drawn on the outside edges.
o Apply silicone to the back of the DS and groove of the back bottom panel
o Install the tongue of DS into the groove of panel
Installing Top Panel Layer
Dry fit Top Level Back Panel aligning top of panel to line on the wall as well as the tongue (male) fitting
into the groove (female) of DS.
o Pull off and apply silicone circles to the back of the panel, both of the Internal Trims and the
groove of the DS and Install panel
Dry fit the Upper Level Valve Wall to make sure it fits by the top of the panel meeting the line on the
wall as well as outside line on wall for the edge of the panel and make sure tongue (male) slots into
groove (female)of DS.
o Make sure that the shower head hole lines up properly.
o Apply silicone to the groove (female) of the DS, Internal Trim channel as well as to the back
of the panel but make sure to hold the silicone 1 ½” short of the top & outside edge lines on
wall for the trims to slot in later, Install panel.
Dry fit the Upper Level Opposite Wall to make sure it fits by the top of the panel meeting the line on the
wall as well as outside line on wall for the edge of the panel and make sure the tongue (male) slots into
groove (female) of DS.
Apply silicone to the groove (female) of the DS, Internal Trim channel as well as to the back of the panel,
leave 1 ½” clearance on all outer edges where the external trim will be installed later. (pic. 4.3).