User manual
NOTE: "ON" is down
1. Set the DIP switches. If you have only one OmniView
™
PRO, use the MASTER bank setting.
If the OmniView
™
PRO you are using will be daisy-chained off another unit, use a unique
slave setting. Please refer to the previous section for more information.
Hardware Installation (continued)
6
PLEASE FOLLOW THIS INSTALLATION PROCEDURE EXACTLY. NOT DOING SO MAY RESULT
IN KEYBOARD AND/OR MOUSE ERRORS, OR FAULTY OPERATION.
WARNING: Before attempting to connect anything to the OmniView
™
PRO or
the computers, make sure everything is powered off. Plugging and unplugging
cables may cause irreversible damage to your computers and the OmniView
™
PRO. Belkin Components will not be held responsible for damage caused.
BANK ADDRESS
2. Find a convenient place to put your OmniView
™
PRO. Its 48.3cm form factor makes it ideal
for 48.3cm racks. When mounting to a rack, attach the included brackets to the sides of
the OmniView
™
PRO. Take note of the length of your cables so that your computers,
OmniView
™
PRO, keyboard, mouse, and monitor are distanced properly.
DIP SWITCH #
3
45
6
ON
ON
ON
ON
OFF
ON ON
ON
ON
OFF ON
ON
OFF
OFF ON
ON
ON
ON OFF
ON
OFF
ON OFF
ON
ON
OFF OFF
ON
OFF
OFF OFF
ON
ON
ON ON
OFF
OFF
ON ON
OFF
ON
OFF
ON
OFF
OFF
OFF
ON
OFF
ON
ON
OFF
OFF
OFF
ON
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
OFF
OFF
BANK 0 MASTER
BANK 1 slave
BANK 2 slave
BANK 3 slave
BANK 4 slave
BANK 5 slave
BANK 6 slave
BANK 7 slave
BANK 8 slave
BANK 9 slave
BANK A slave
BANK B slave
BANK C slave
BANK D slave
BANK E slave
BANK F slave
P73055/F1D108-OSD/EU/man.qxd 4/21/00 2:25 PM Page 6