User guide

Port Assignment, Termination, Cable Length 51
Installation
IAE = ISDN wall socket (German ISDN „Anschluss Einheit”)
If the S0 bus is coming from the Forum 523/524 leading to one or
more IAE sockets, the terminating resistors (“TR”) in the
Forum 523/524 and in the most distant IAE socket needs to be
switched on.
If the cabling of the S
0
bus is realized with two lines, outgoing
from the Forum 523/524 and leading to several IAE sockets, the
terminating resistors (“TR”) in both most distant IAE sockets
needs to be switched on. The terminating resistors in the
Forum 523/524 must be switched off. The S
0
bus should not be
installed as star topology. Sub-distributions are not allowed
either.
Termination on an IAE socket: IAE sockets with built-in resistors
are recommended, because the terminating resistor can be
switched on or off with a mechanical switch. The figure shows how
to mount resistors in an IAE socket without switchable resistors.
You can add S
0
ports by installing appropriate S
0
interface cards
in a slot. These S
0
ports can be switched between internal and
external operating modes.
Line termination:
Enabled
IAEIAEIAE
Line termination:
Disabled
IAEIAEIAE
1a
1b
2a
2b
TR
TR