CAUTION!
Polluted inlet air!
In case of heavily polluted inlet air (ISO 8573.1 class 3.-.3 or worse quality), we recommend the additional
installation of a pre-filter (f.e. CLEARPOINT F040) to prevent a clogging of the heat exchanger
Type A installation is suggested when the compressor operates at reduced intermittence and the total consumption
equals the compressor flow rate.
Type B installation is suggested when the air consumption can consistently change with peak values highly exceeding
the flow rate of the compressor. The capacity of the tank must be sized in order to compensate eventual instantaneous
demand conditions (peak air consumption).