Phase2Phase1
L1 N1 L2 N2 L3 N3
Phase1 Phase2 Phase3
L1 N1 L2 N2 L3 N3
CONFIG.3
ph1
ph2
ph3
N
210V
CONFIG.4
ph1
ph2ph3
N
210V
210V
210V
The lines (L1, L2, L3) and neutrals (N1, N2, N3) of the three power supplies must be connected so that each of
them is affected by a pair of different phases.
The lines of the three power supplies (L1, L2, L3) must be connected together to the phase 1 of the electri-
cal mains, while the three neutrals (N1, N2, N3) must be connected together to the phase 2 of the electrical
mains.
Configuration to be implemented on the transmitter terminalNetwork configuration available
Network configuration available Configuration to be implemented on the transmitter terminal
Quick instructions for commissioning
Elenos recommends the use of surge suppression devices for the AC lines to prevent
high voltage damage due to lighting strike near the transmitter site.