Tus neeg siv phau ntawv
Table Of Contents
- Installation Instructions
- NOTE: Read the entire instruction manual before starting the installation.
- TABLE OF CONTENTS
- SAFETY CONSIDERATIONS
- SEQUENCE OF OPERATION
- INTRODUCTION
- DESCRIPTION AND USAGE
- a. In the Side-by-Side, upflow and downflow applications, reference the furnaces from the front, as you would see them in the upflow application. (See Fig. 2 and Fig. 3) The LH furnace is the Main furnace and the RH furnace is the Secondary furnace.
- b. In the Back-to-Back, upflow, downflow and horizontal applications, reference the furnaces from the side of the external extension harness. The LH furnace is the Main furnace and the RH furnace is the Secondary furnace, as you would see them in the...
- Fig. 1 – External Extension
- SECTION 1
- DUCT CONNECTIONS - ALL MODELS
- ELECTROSTATIC DISCHARGE (ESD) PRECAUTION
- 1. Disconnect all power to the furnace. DO NOT TOUCH THE CONTROL OR ANY WIRE CONNECTED TO THE CONTROL PRIOR TO DISCHARGING YOUR BODY’S ELECTROSTATIC CHARGE TO GROUND.
- 2. Firmly touch a clean, unpainted, metal surface of the furnace chassis which is close to the control. Tools held in a person’s hand during grounding will be satisfactorily discharged.
- 3. After touching the chassis you may proceed to service the control or connecting wires as long as you do nothing that recharges your body with static electricity (for example; DO NOT move or shuffle your feet, DO NOT touch ungrounded objects, etc).
- 4. If you touch ungrounded objects (recharge your body with static electricity), firmly touch furnace again before touching control or wires.
- 5. Use this procedure for installed and uninstalled (ungrounded) furnaces.
- 6. Before removing a new control from its container, discharge your body’s electrostatic charge to ground to protect the control from damage. If the control is to be installed in a furnace, follow items 1 through 5 before bringing the control or yo...
- 7. An ESD service kit (available from commercial sources) may also be used to prevent ESD damage.
- SECTION 2
- GENERAL - ALL ORIENTATIONS
- Install furnaces
- 1. Select two identical heating and airflow furnaces. (See Table 2 or Table 3)
- 2. Remove bottom closure panels from both furnaces. (See Fig. 5)
- a. Remove main and blower access doors.
- b. Remove screws from front filler panel.
- c. Rotate front filler panel downward to remove.
- d. Remove bottom closure panel and set aside.
- e. Reinstall front filler panel and bottom closure panel (when used)
- Install furnaces
- GENERAL - ALL ORIENTATIONS
- .
- .
- .
- Fig. 6 – Location of Foam Strips
- UPFLOW INSTALLATION
- 5. Remove the 7/8-in. (22 mm) knockout in the mating side of each furnace blower compartment. Remove one right side knockout from one furnace and the left side knockout from the other furnace. The furnace with the right side knockout removed will bec...
- 6. For side-by-side applications insert one snap bushing through each 7/8-in. (22 mm) knockout.
- 7. Position furnaces against each other on common return-air plenum (See Fig. 2). For side-by-side installations, adjust and shim each furnace to align 7/8-in. (22 mm) knockout in blower compartment, which will be used for wire routing between furnaces.
- 8. Drill two 1/8-in. (3 mm) holes, approximately 1-in. (25 mm) below discharge air flange, from inside top of discharge opening and through both furnaces.(See Fig. 7)
- 9. Drive 1 factory-supplied No. 6 x 3/4-in. (19 mm) LG screw through each hole and tighten until furnaces are secure and foam strips have sealed gap between furnaces.
- 10. Bend or remove flanges on supply air outlet of furnace as shown in furnace installation instructions.
- 11. Install indoor coil(s) and/or common supply plenum on supply air outlet of furnace. Seal all duct connections to furnace with code approved tape or sealant.
- 12. Connect common return plenum on furnace. Seal all duct connections to furnace with code approved tape or sealant.
- 13. Refer to the furnace installation instructions to complete the remaining furnace installation.
- Fig. 7 – Furnaces Together at Discharge Opening
- DOWNFLOW INSTALLATIONS
- 1. Remove the 7/8-in. (22 mm) knockout in the mating side of each furnace blower compartment. Remove one right side knockout from one furnace and the left side knockout from the other furnace. The furnace with the right side knockout removed will bec...
- 2. Insert one snap bushing through each 7/8-in. (22 mm) knockout.
- 3. Bend or remove flanges on supply air outlet of furnace as shown in furnace installation instructions
- 4. Position furnaces in the downflow position on the entering air-side of indoor coils and or common supply plenum. If no approved cased indoor coil is used, install the furnaces on accessory combustible floor bases. For side-by-side installations, a...
- 5. Drill two 1/8-in. (3 mm) holes, approximately 1-in. (25 mm) below return air flange, from inside top of return air opening and through both furnaces. (See Fig. 8)
- 6. Drive 1 factory-supplied No. 6 x 3/4-in. (19 mm) LG screw through each hole and tighten until furnaces are secure and foam strips have sealed gap between furnaces.
- 7. Connect common return plenum to furnaces. Seal all duct connections to furnace with code approved tape or sealant.
- Fig. 8 – Attaching Furnaces Together at Return Air Opening
- HORIZONTAL INSTALLATION
- General
- Attic Platform Back to Back Installations for Condensing Furnaces and Non-Condensing Furnaces
- 1. Construct a platform from 3/4-in. (19 mm) (nominal plywood), extending out 30 inches (762 mm) from the front of each furnace. (See Fig. 9 - Fig. 11)
- 2. Maintain all clearances to combustibles per the furnace Installation, Start-up and Operating Instructions.
- 3. Follow all additional building codes.
- 4. Long truss spans may require additional support along the bottom chord of the truss. Consult the truss manufacturer’s guidelines for engineering assistance.
- 5. Long rafter or attic joist spans may require additional support along the bottom of the rafter or joist. Consult local or regional building codes for design and loading requirements.
- 6. Lay both furnaces in the required orientation with the knockouts in the blower compartment facing upward.
- 7. Drill two 1/8-in. (3 mm) holes, approximately 1-in. (25 mm) below return air flange, from inside top of return air opening and through both furnaces. (See Fig. 8)
- 8. Drive 1 factory-supplied No. 6 x 3/4-in. (19 mm) LG screw through each hole and tighten until furnaces are secure and foam strips have sealed gap between furnaces.
- 9. Drill two 1/8-in. (3 mm) holes, approximately 1-in. (25 mm) below discharge air flange, from inside top of discharge opening and through both furnaces. (See Fig. 7)
- 10. Drive 1 factory-supplied No. 6 x 3/4-in. (19 mm) LG screw through each hole and tighten until furnaces are secure and foam strips have sealed gap between furnaces.
- 11. Install indoor coil(s) and/or common supply plenum on supply air outlet of furnace. Seal all duct connections to furnace with code approved tape or sealant.
- 12. Connect common return plenum to furnaces. Seal all duct connections to furnace with code approved tape or sealant.
- 13. Follow individual furnace installation instructions for horizontal applications. This includes, but not limited to: condensate trap, condensate/inducer housing tubing, pressure switch tubing venting and electrical connections.
- 14. Go to Connect Electrical Components.
- Horizontal Suspended Installation for Condensing Furnaces
- 1. Furnaces may be suspended using two (2) pieces of 1-1/2-in. x 1-1/2-in. x 1/4-in. (38 mm x 38 mm x 6 mm) thick cold rolled angle iron underneath each furnace and four (4) 3/8-in. (10 mm) diameter threaded rods. Angle iron must be positioned as sho...
- 2. Unistrut or similar material may be used, provided that the furnaces do not sag in the middle or bend or twist at the support ends. The support material must be secured to the bottom of each furnace in a manner similar to securing angle iron to th...
- 3. Each piece of angle iron must be secured to the bottom of each furnace with at least two (2) No..8 x 3/4-in. (19 mm) sheet metal screws.
- 4. Drill four 5/16-in. (8 mm) holes through the angle iron and through each side of the casing for the suspension rods as shown in Fig. 12.
- 5. Lay furnaces back-to-back on a flat surface with 7/8 knock-outs facing upward.
- 6. Drill two 1/8-in. (3 mm) holes, approximately 1-in. (25 mm) below return air flange, from inside top of return air opening and through both furnaces. (See Fig. 8)
- 7. Drive one factory-supplied No. 6 x 3/4-in. (19 mm) LG screw through each hole and tighten until furnaces are secure and foam strips have sealed gap between furnaces.
- 8. Drill two 1/8-in. (3 mm) holes, approximately 1-in. (25 mm) below discharge air flange, from inside top of discharge opening and through both furnaces. (See Fig. 7)
- 9. Drive one factory-supplied No. 6 x 3/4-in. (19 mm) LG screw through each hole and tighten until furnaces are secure and foam strips have sealed gap between furnaces.
- 10. Insert the 1/4-in. (6 mm) threaded rod through each hole in the furnace and through the angle iron. Secure the threaded rod to the angle iron with a washer, lock washer and nut.
- 11. To prevent the rod from falling out of the furnace, install a washer, lock washer and nut on portion of the threaded rod above the furnace.
- 12. Raise and suspend the furnaces using the appropriate lift and secure the threaded rod with the appropriate field-supplied hardware. Use locking hardware such as lock washers and jamb nuts to prevent nuts or bolts from loosening.
- 13. Install indoor coil(s) and/or common supply plenum on supply air outlet of furnace. Seal all duct connections to furnace with code approved tape or sealant.
- 14. Connect common return plenum to furnaces. Seal all duct connections to furnace with code approved tape or sealant.
- 15. Follow individual furnace installation instructions for horizontal applications. This includes, but not limited to: condensate trap, condensate/inducer housing tubing pressure switch tubing venting and electrical connections.
- 16. Go to Connect Electrical Components.
- Horizontal, Suspended Installation for Non-Condensing Furnaces
- 1. Furnaces may be suspended using two (2) pieces of 1-1/2-in. x 1-1/2-in. x 1/4-in. thick cold rolled angle iron underneath each furnace and four (4) 3/8-in. (10 mm) diameter threaded rods. (See Fig. 13)
- 2. Allow for at least 9 inches (228 mm) in front of each door for door removal.
- 3. Each piece of angle iron must be secured to the bottom of each furnace with at least two (2) No. 8 x 3/4-in. (19 mm) sheet metal screws.
- 4. Maintain all clearances to combustibles per the furnace Installation, Start-up and Operating Instructions.
- 5. Unistrut or similar material may be used, provided that the furnaces do not sag in the middle or bend or twist at the support ends. The support material must be secured to the bottom of each furnace in a manner similar to securing angle iron to th...
- 6. For all horizontal applications: Return air can only be connected to bottom opening of furnace. A common return air plenum is required for proper auxiliary limit switch operation.
- 7. Apply two factory-supplied foam strips to the back of each furnace. Locate strips equal distance from top and bottom as shown in Fig. 6. Trim off excess material.
- 8. Determine which side of furnace will be used to route external extension harness. Remove 7/8-in. diameter accessory hole knockouts in blower compartment side selected to attach harness to. (See Fig. 1)
- 9. Position furnaces back-to-back on attic platform or suspended supports. Adjust and shim each furnace to align both furnaces. Follow all clearance to combustible material.
- 10. If furnaces are installed closer than 12 inches above a deck made from combustible material, provide rollout protection as shown in the furnace installation instructions. The bottom closure pan may be used for this purpose.
- 11. Drill two 1/8-in. holes, approximately 1 in. (25 mm) below discharge flange, from inside top of discharge opening and through both furnaces. (See Fig. 7) Drill two 1/8-in. holes, approximately 1 in. (25 mm) below return air flange, from inside to...
- 12. Drive one factory-supplied No. 6 x 3/4-in. LG screw through each hole and tighten until furnaces are secure and foam strips have sealed gap between furnaces.
- 13. Connect return- and supply-air ducts to furnaces. Seal duct connections to prevent air leakage.
- 14. Move 115V junction box JB in either furnace from left-hand side to right-hand side if required. Refer to furnace installation instructions for complete details.
- 15. Go to Connect Electrical Components.
- Fig. 9 – Attic Installation of Furnace for Condensing Furnace ONLY
- Fig. 10 – Attic Installation of Back-to-Back Furnace for Non-Condensing Furnace ONLY
- Fig. 11 – Attic Installation of Horizontal Furnace Stacked Together for Non-Condensing Furnaces ONLY.
- Fig. 12 – Suspended Installation for Condensing Furnace ONLY
- Fig. 13 – Suspended Back-to-Back for Non-Condensing Furnaces ONLY.
- Fig. 14 – Suspended Installation for Horizontal Furnaces Stacked Together for Non-Condensing Furnaces ONLY.
- Horizontal, Stacked Together for Non-Condensing ONLY
- 1. Construct a platform from 3/4-in. (nominal plywood), extending out 30 inches (762 mm) from the front of each furnace.
- 2. Maintain all clearances to combustibles per the furnace Installation, Start-up and Operating Instructions.
- 3. Follow all additional building codes.
- 4. Long truss spans may require additional support along the bottom chord of the truss. Consult the truss manufacturer’s guidelines for engineering assistance.
- 5. Long rafter or attic joist spans may require additional support along the bottom of the rafter or joist. Consult local or regional building codes for design and loading requirements.
- 1. Furnaces may be suspended using two (2) pieces of 1-1/2-in. x 1-1/2-in. x 1/4-in. thick cold rolled angle iron underneath the furnaces and four (4) 3/8-in. diameter threaded rods.
- 2. Allow for at least 9 inches (229 mm) in front of each door for door removal.
- 3. Each piece of angle iron must be secured to the bottom of each furnace with at least two (2) #8 x 3/4-in. sheet metal screws.
- 4. Maintain all clearances to combustibles per the furnace Installation, Start-up and Operating Instructions.
- 5. Unistrut or similar material may be used, provided that the furnaces do not sag in the middle or bend or twist at the support ends. The support material must be secured to the bottom of each furnace in a manner similar to securing angle iron to th...
- 6. For all horizontal applications: Return air can only be connected to bottom opening of furnace.
- 7. Apply 2 factory-supplied foam strips to mating side of each furnace. Locate strips equal distance from top and bottom as shown in Fig. 6.
- 8. Remove 7/8-in. diameter accessory hole knockouts in blower compartment from mating sides of furnaces.
- 9. Insert a plastic snap bushing through the 7/8-in. K.O. from the outside of the casing.
- 10. Position furnaces on top of each other on platform or suspended supports. Adjust and shim each furnace to align 7/8-in. diameter holes in both furnaces.
- 11. Drill two 1/8-in. holes, approximately 1 in. (25 mm) below discharge flange, from inside top of discharge opening and through both furnaces. (See Fig. 7) Drill two 1/8-in. holes, approximately 1 in. (25 mm) above return air opening flange, from i...
- 12. Drive 1 factory-supplied screw through each hole and tighten until furnaces are secure and foam strips have sealed gap between furnaces.
- 13. Connect return- and supply-air ducts to furnaces. Seal duct connections to prevent air leakage.
- 14. Move 115-v junction box JB in RH furnace (as viewed from the upflow position) from left-hand side to right-hand side. Refer to furnace installation instructions for complete details.
- 15. Go to Connect Electrical Components.
- SECTION 3
- CONNECT ELECTRICAL COMPONENTS
- 115-VAC Connections to Furnace
- a. Both LEDs are on continuously: System phasing is okay.
- b. One or both LEDs are rapidly flashing:
- (1.) Line voltage polarity is reversed.
- (2.) Furnace(s) are not grounded
- (3.) Transformer polarity is reversed.
- c. One LED is off, one LED is on continuously:
- (1.) The 24-VAC circuit is inoperative on furnace with LED light off.
- (2.) Check transformers, auxiliary limits, and door switches in both furnaces and correct problem.
- (3.) Reconnect lead at TWIN/TEST terminal of LH furnace and observe LED at each furnace. The LEDs will glow steady for proper phasing.
- 115-VAC Connections to Furnace
- TWINNING KIT HARNESS CONNECTIONS
- 1. Verify the knockouts are removed from the same side of each furnace blower compartment.
- 2. Remove the locknut from each end of the 1/2-in. BX connector
- 3. Route the 4-pin plug and the 2-pin plug of the Main furnace end of the Extension harness one at a time through the knockout into the Main furnace blower compartment.
- 4. Insert the plugs through the locknut of the 1/2-in. BX connector and tighten the locknut on the BX connector.
- 5. Route the 4-pin plug and the 2-pin plug of the Secondary furnace end of the Extension harness one at a time through the knockout into the Secondary furnace blower compartment.
- 6. Insert the plugs through the locknut of the 1/2-in. BX connector and tighten the locknut on the BX connector.
- Install Main Twinning Kit Harness
- 7. Connect the Yellow wire labeled “TEST” to the “TEST/TWIN” terminal on the Main furnace control board.
- 8. Remove the Red transformer lead from the “SEC-1/24 VAC” terminal on the Main furnace control board.
- 9. Connect the Red transformer lead removed from the Main furnace control board to the Red wire labeled “TRANS” on the Main Twinning Kit harness.
- 10. Connect the Orange wire labeled “SEC-1/24 VAC” to the “SEC-1/24 VAC” terminal on the Main furnace control board.
- 11. Connect the Black wire with the fork terminal labeled “C” on the TKR to the “COM/24V” terminal on the thermostat strip of the Main furnace control board.
- 12. Install the Twinning Kit Relay, (TKR)
- a. For single-stage operation of single-stage furnaces connect the White wire with the fork terminal labeled “W” on the TKR to the “W” terminal on the thermostat strip of the Main furnace control board. See Fig. 20.
- b. For staged operation of single-stage furnaces with a two-stage thermostat, remove the fork terminal from the terminal on the TKR and discard. The thermostat W2 lead is spliced into this wire. Refer to Fig. 21 and Thermostat Connections section for...
- c. For operation of two-stage furnaces with a single-stage or two-stage thermostat, connect the White wire with the fork terminal on the TKR to the “W/W1” terminal on the thermostat strip of the Main furnace control board. Refer to Fig. 19 and Th...
- Install Secondary Twinning Kit Harness
- 1. Connect the Yellow wire labeled “TEST SECONDARY” to the “TEST/TWIN” terminal on the Secondary furnace control board.
- 2. Connect the Black wire with the fork terminal labeled “C SECONDARY” to the “COM/24V” terminal on the thermostat strip of the Secondary furnace control board.
- 3. Connect the White wire with the fork terminal labeled “W SECONDARY” to the “W” or “W/W1” terminal on the thermostat strip of the Secondary furnace control board.
- 4. Connect the Red wire with the fork terminal labeled “R SECONDARY” to the “R” terminal on the thermostat strip of the Secondary furnace control board.
- 5. Remove the Red transformer lead from the “SEC-1/24 VAC” terminal on the Secondary furnace control board.
- 6. Connect the Red wire with the piggy-back terminal labeled “SEC-1/24 VAC” on the ILR to the “SEC-1/24 VAC” terminal on the Secondary furnace control board.
- 7. Connect the Red transformer lead to the piggy back terminal of the Red wire connected to the “SEC-1/24 VAC” terminal on the Secondary furnace control board.
- 8. Remove the Blue transformer lead from the “SEC-2/COM” terminal on the Secondary furnace control board.
- 9. Connect the Black wire with the piggy-back terminal labeled “C” on the ILR to the “SEC-1/24 VAC” terminal on the Secondary furnace control board.
- 10. Connect the Blue transformer lead to the piggy back terminal of the Black wire connected to the “SEC-1/24 VAC” terminal on the Secondary furnace control board.
- a. Mount Twinning Kit Relay and Interlock Relay on furnace blower housing as shown.
- b. Twining Kit Relay (TKR) mounts on LH Furnace blower housing
- c. Interlock Relay (ILR) mounts on RH furnace blower housing.
- Fig. 15 – Mounting Twinning Kit Relay
- Fig. 16 – Extension Harness
- Fig. 17 – Main Harness
- Fig. 18 – Secondary Harness
- Fig. 19 – Example of Furnace Control
- CONNECT ELECTRICAL COMPONENTS
- CONNECT ELECTRICAL COMPONENTS - COOLING
- 1. Connect the L1 lead of the field-supplied transformer line voltage lead to L1 on Main furnace control board.
- 2. Connect the Neutral lead of the field-supplied transformer to an open Neutral terminal on the Main furnace control board.
- For Single-Stage A/C Operation with Single-Stage Thermostat See Fig. 20.
- 1. Connect one coil terminal of the field-supplied pilot duty relay to the “COM/24V” terminal of the furnace control board.
- 2. Connect the other coil terminal of the field-supplied pilot duty relay to the “Y or Y/Y2” terminal of the furnace control board.
- 3. Connect the R terminal of the field-supplied transformer to the open contract of the pilot duty relay.
- 4. Connect the other open contact to the wire for Y terminal of the contactor(s).
- 5. Connect the Common terminal of the contactor(s) to the C terminal of the field supplied transformer.
- For Two-Stage A/C Operation with a Two-Stage thermostat. See Fig. 21.
- 1. Connect one coil terminal of each of the pilot duty relay together.
- 2. Connect these two terminals to the “COM/24V” terminal of the furnace control board.
- 3. Select one of the relays to be the relay for first stage cooling. Connect the coil terminal of this relay to the “Y or Y/Y2” terminal of the furnace control board.
- 4. The other relay is the second stage cooling relay. The coil terminal of this relay will connect to the “Y/Y2” terminal of the thermostat. Do not connect the terminal to the Y1 terminal on the furnace control board.
- 5. Connect the R terminal of the field-supplied transformer to the open contract of each pilot duty relay.
- 6. Connect the other open contact of the first stage cooling relay to the wire for Y terminal of the first stage contactor.
- 7. Connect the other open contact of the first stage cooling relay to the wire for Y terminal of the second stage contactor.
- 8. Connect the Common terminal of the contactor(s) to the C terminal of the field supplied transformer.
- THERMOSTAT CONNECTIONS
- Single-Stage Furnaces with Single-Stage Thermostat (Field Supplied) See Fig. 20 and Table 4
- 1. Connect thermostat W lead to “W” on the Main furnace control board.
- 2. Connect thermostat Y lead to “Y or Y/Y2” on the Main furnace control board.
- 3. Connect the G thermostat lead to the “G” terminal on the Main furnace control board.
- 4. Connect thermostat R lead to “R” terminal on Main furnace control.
- 5. Connect thermostat C or COM lead to the “COM/24V” terminal on the Main furnace control board.
- Single-Stage Furnaces and A/C with Two-Stage thermostat (Field Supplied) See Fig. 21 and Table 4
- 1. Connect thermostat W1 lead to “W” on the Main furnace control board.
- 2. Connect thermostat W2 lead to White wire labeled “W” on the twinning kit relay (TKR).
- 3. Connect first stage cooling thermostat lead Y1 to “Y or Y/Y2” on the Main furnace control board.
- 4. Connect the second stage cooling thermostat lead Y/Y2 to the pilot duty relay coil for the second stage contactor.
- 5. Connect the G thermostat lead to the “G” terminal on the Main furnace control board.
- 6. Connect thermostat R lead to “R” terminal on Main furnace control.
- 7. Connect thermostat C or COM lead to the “COM/24V” terminal on the Main furnace control board.
- 8. Connect the G thermostat lead to the “G” terminal on the Main furnace control board.
- 9. Connect thermostat R lead to “R” terminal on Main furnace control.
- 10. Connect thermostat C or COM lead to the “COM/24V” terminal on the Main furnace control board.
- Fig. 20 – Single-Stage Furnace with Single-Stage Thermostat
- Fig. 21 – Single-Stage Furnaces with Two-Stage Thermostat
- Fig. 22 – Two-Stage Furnace
- Two−Stage Furnaces with Single-Stage Thermostat (Field Supplied)
- 1. Connect thermostat W lead to “W/W1” on Main furnace control board.
- 2. On Main/Primary Furnace Enable 1-stage heating thermostat on control board by:
- a. For boards with DIP switches, turn SW1-2 on furnace control OFF, see Fig. 22.
- b. For boards with 3 digit display, navigate to (Htt) and select (1St), see Fig. 22. See furnace installation manual for additional instructions.
- 3. On RH/Secondary furnace, enable 2-stage thermostat on control board by:
- a. For boards with DIP switches, turn SW1-2 on furnace control ON, see Fig. 22.
- b. For boards with 3 digit display, navigate to (Htt) and select (2St), see Fig. 22. See furnace installation manual for additional instructions.
- 4. Connect cooling thermostat lead Y to “Y/Y2” on the Main furnace control board.
- 5. Connect the G thermostat lead to the “G” terminal on the Main furnace control board.
- 6. Connect thermostat R lead to “R” terminal on Main furnace control.
- 7. Connect thermostat C or COM lead to the “COM/24V”terminal on the Main furnace control board.
- Two−Stage Furnaces with Two−Stage Thermostat (Field Supplied)
- 1. Connect thermostat W to “W/W1” on Main furnace control board.
- 2. Connect thermostat W2 to “W2” on Main furnace control board.
- 3. On Main/Primary Furnace Enable 2-stage heating thermostat on control board by:
- a. For boards with DIP switches, turn SW1-2 on furnace control ON, see Fig. 22.
- b. For boards with 3 digit display, navigate to (Htt) and select (2St), see Fig. 22. See furnace installation manual for additional instructions.
- 4. On RH/Secondary furnace, enable 2-stage thermostat on control board by:
- a. For boards with DIP switches, turn SW1-2 on furnace control ON, see Fig. 22.
- b. For boards with 3 digit display, navigate to (Htt) and select (2St), see Fig. 22. See furnace installation manual for additional instructions.
- 5. Connect first stage cooling thermostat lead Y1 to “Y/Y2”on the Main furnace control board.
- 6. Connect the second stage cooling thermostat lead Y/Y2 to the pilot duty relay coil for the second stage contactor.
- 7. Connect the G thermostat lead to the “G” terminal on the Main furnace control board.
- 8. Connect thermostat R lead to “R” terminal on Main furnace control.
- 9. Connect thermostat C or COM lead to the “COM/24V” terminal on the Main furnace control board.
- Table 4 – Single-Stage Thermostat Connections
- Table 5 – Two-Stage Furnace Thermostat Connections
- Single-Stage Furnaces with Single-Stage Thermostat (Field Supplied) See Fig. 20 and Table 4
- VENTING
- GAS SUPPLY PIPING
- CONDENSATE DRAIN CONNECTIONS
- START-UP AND ADJUSTMENT
- 1. Shut off all power and gas to both furnaces.
- 2. For control boards with display and push-buttons, set the twinning menu item on the Secondary Furnace to SEC as shown on wiring label. For two-stage furnaces, also set the heating thermostat type (HTT) as shown on wiring label.
- 3. Set the heating blower speed to the same setting or tap on both furnaces. Repeat for cooling and continuous fan speed settings.
- 4. Attach twinning connection wiring label above the existing furnace wiring label on the inside of the LH furnace blower door. Use the following labels for the following applications:
- 5. Attach twinning reference label 348926-101 on the outside of blower access door of RH furnace.
- Fig. 23 – Example of Twinning Reference Label
- 6. Manually close the door switch on both furnaces.
- 7. Turn on power and gas to furnaces.
- 8. For control boards with display and pushbuttons, observe the 3 digit display on both furnaces. When the display is showing system status, the dots at the bottom of the display indicate the communication status of the primary and secondary furnaces...
- Fig. 24 – Twinning Communication Indicator
- 9. Using the appropriate section below, operate furnaces through two cycles in each mode to confirm correct operation by operating only the thermostat.
- a. Single- or two-stage gas heating thermostat R to W/W1 for low-heat. Single-stage thermostat with adaptive heating mode causes furnace to operate in low-heat mode for up to 16 minutes, and then furnace automatically switches to high-heat. First sta...
- b. First and second-stage of two-stage heating thermostat R to W/W1 and W2 for high-heat.
- c. Thermostat R to G for continuous fan. (SeeTable 4 or Table 5)
- d. Cooling thermostat R to G and Y or Y/Y2 for single stage cooling blower or for two-stage cooling high-cool blower.
- 10. Reinstall doors on both furnaces.
- 11. Instruct user in operation of furnaces and thermostat.
- SEQUENCE OF OPERATION
- SINGLE-STAGE HEAT, SINGLE-STAGE FURNACES WITH SINGLE-STAGE THERMOSTAT
- TWO-STAGE HEAT, SINGLE-STAGE FURNACES WITH TWO-STAGE THERMOSTAT
- 1. The two-stage thermostat determines if furnaces are operating in first-stage heat (LH furnace operates in heat while RH furnace blower operates but RH furnace is not heating) or if furnaces are operating in second-stage heat (both furnaces operate...
- 2. Operation in all modes (sequence of operation) is the same for twinned furnaces as for an individual furnace. See furnace Installation, Start-Up, and Operating Instructions for more information on sequence of operation.
- TWO-STAGE HEAT, TWO-STAGE FURNACES WITH SINGLE-STAGE THERMOSTAT
- Fig. 25 – Furnace Thermostat Switch
- Table 6 – Setup Selection
- 1. LH furnace control determines whether furnaces are both operating in low-heat or high-heat, depending on the control’s adaptive gas heating mode when the R-to-W/W1 circuit is closed in LH furnace.
- 2. Operation in all modes (sequence of operation) is the same for twinned furnaces as for an individual furnace. See furnace Installation, Start-Up, and Operating Instructions for more information on sequence of operation.
- TWO-STAGE HEAT, TWO-STAGE FURNACES WITH TWO-STAGE GAS-HEAT THERMOSTAT
- 1. The two-stage thermostat (NOT the furnace control’s adaptive gas heating mode) determines whether furnaces are both operating in low-heat or high-heat, depending on whether one or both thermostat stages (W/W1 or W/W1 and W2) are calling for heat.
- 2. Operation in all modes (sequence of operation) is the same for twinned furnaces as for an individual furnace. See furnace Installation, Start-Up, and Operating Instructions for more information on sequence of operation.
- NOTE: Read the entire instruction manual before starting the installation.
AGATWNDTE01C: Installation Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
3
Single Stage PSC
59SC2
(Series A)
912S
(Series A)
PG92SAS 59SC5A 915SA PG95S_S N9MSE
N9MSB
(Series A)
R9MSB
(Series A)
WFAR
(Series A)
WFSR
060--10 30060 30060 060-10 30060 30060 0601410 0601412
060--12 36060 36060 060-14 42060 42060 0601714 0601716 0601716 060B048 060B042
060--14 42060 42060 080-16 48080 48080 0801716 0801716 0801716 080B048 080B048
060--16 48060 48060 080-20 60080 60080 0802120 0802120 080C060 080C060
080--16 48080 48080 100-14 42100 42100 1002114 1002116 100C048 100C042
080--20 60080 60080 100-16 48100 48100 1002120 1002122 100C060
100--14 42100 42100 100-20 60100 60100
100--16 48100 48100 120-20 60120 60120
100--20 60100 60100
100--22 66100 66100
120--20 60120 60120
120--22 66120 66120
Single Stage FCT ECM
59SP5 925S (F/G)9MXE 59SC5B 915SB PG95ESAA (N/R)95ESN WFSX
060--12 36060 0601412 060E17--14 42060E17 42060B 0601714 060B042
060--14 42060 0601714 080E17--16 48080E17 48080B 0801716 080B048
080--16 48080 0801716 080E21--20 60080E21 60080C 0802120 080C060
080--20 60080 0802120 100E21--20 60100E21 60100C 1002120 100C060
100--16 48100 1002120 120E24--22 66120E24 66120D 1202422 120D066
100--20 60100 1202422 140E24--22 66140E24 66140D 1402422 140D066
120--20 60120 1202422
120--22 66120
59SC2D 912SD PG92ESAA (N/R)92ESN WFAX
060E17--14 42060E17 42060B 0601714 060B042
080E17--16 48080E17 48080B 0801716 080B048
080E21--20 60080E21 60080C 0802120 080C060
100E21--20 60100E21 60100C 1002120 100C060
120E24--20 60120E24 60120D 1202420 120D060
Two Stage FCT ECM
59TP5 925T PG95X_T (F/G)9MXT
060--12 36060 36060 0601412
060--14 42060 42060 0601714
080--16 48080 48080 0801716
080--20 48100 48100 0802120
100--16 60080 60080 1002120
100--20 60100 60100 1202422
120--22 66120 66120 1202420
Table 3 – Non-Condensing Models
80% Non-Condensing Furnaces
Single Stage MCT ECM
58SC(0/1) 58SB(0/1) 81(0/1)S 80(0/1)S PG80MS(A/L) N80MS(N/L) WFE(R/L) R80ES(N/L)
070M21--16 070M21--16 48070M21 48070M21 48070C 0702116 070C48 0702116
090M21--16 090M21--16 48090M21 48090M21 48090C 0902116 090C48 0902116
090M21--20 090M21--20 60090M21 60090M21 60090C 0902120 090C60 0902120
090M24--20 090M24--20 60090M24 60090M24 60090D 0902420 090D60 0902420
110M21--20 110M21--20 60110M21 60110M21 60110C 1102120 110C60 1102120
110M24--20 110M24--20 60110M24 60110M24 60110D 1102420 110D60 1102420
135M24--20 135M24--20 60135M24 60135M24 60135D 1352420 135D60 1352420
155M24--20 60155M24
80% Non-Condensing Furnaces
Single Stage VCT ECM
58SP(0/1)B 82(0/1)B
N80VSL
(B Series)
070V17--16 48070V17 0701716
090V17--16 48090V17 0901716
090V21--20 60090V21 0902120
110V21--22 66110V21 1102122
135V24--22 66135V24 1352422
80% Non-Condensing Furnaces
Two Stage VCT ECM
58TP0B/58TP1B 820TB/821TB PG80VTLB
(F/G)80VTL
(B Series)
WFET
070V17--16 48070V17 48070B 0701716 070A036
090V17--16 48090V17 48090B - -
090V21--20 60090V21 60090C 0902120 -
110V21--22 66110V21 66110C 1102122 110C066
135V24--22 66135V24 66135D - -