Overview of Primary Product

Before Calling a Manufacturers Tech Service . . .
Before contacting us about your burner, you must have a completed copy of the
Contractor Start-Up Form (located inside last page). This information is crucial for
troubleshooting and obtaining the correct replacement parts.
Always use calibrated test instruments to set combustion levels. Verify
that test instruments are calibrated and in good working condition. If not
already provided, drill test access holes in the ue pipe near the breach (or upstream of
the boiler breach damper, if applicable) and in the front mounting plate area for rebox
pressure. Be careful not to damage any water-backed surface.
Applicances have been
tested or veried by
Beckett but NOT tested or endorsed by
the appliance manufacturer, unless
noted. These settings are not intended to
supersede the appliance manufacturers
published specications. Always follow
the appliance manufacturers published
instructions and recommendations.
The recommended air
settings are intended for
use only as a starting point for burner
adjustments. The settings cannot make
provisions for all installation
possibilities. It is important that the
burner is adjusted to the installation
requirements using properly calibrated
ue gas analysis instruments.
Professional Service
Required
Failure to follow these recommended
settings could lead to equipment
malfunction and result in asphyxiation,
explosion or re.
y Please read the CG4 manual before
proceeding. Follow all instructions
completely.
y This equipment must be installed,
adjusted and started by a qualied service
agency that is licensed and experienced
with all applicable codes and ordinances
and responsible for the installation and
commissioning of the equipment.
y The installation must comply with all local
codes and ordinances having jurisdiction
and the latest edition of the National Fuel
Gas Code ANSI Z223.1 (NFPA 54) and
CAN1-B149.1 in Canada.
For technical assistance please call 1-800-645-2876 (8:00am - 5:00pm EST, Mon-Fri)
1