Instruction manual

4. Remove coil assembly.
5. Remove metal horizontal drain pan from coil assembly.
6. Remove horizontal drain pan support bracket from coil support rail and reinstall to the opposite side of the coil support rail.
7. Remove condensate drain plugs from 1 side of horizontal drain pan and install in drain connection openings on opposite side.
8. Convert air-seal assembly for horizontal right.
a. Remove air-seal assembly from coil by removing 4 screws.
b. Remove air splitter (B) from coil seal assembly by removing 3 screws. (See Fig. 5—factory-shipped inset.)
Fig. 4—Conversion for Horizontal Right Applications Using a Slope Coil
A90174
COIL MOUNTING
SCREW
BLOWER
ASSEMBLY
COIL SUPPORT
RAIL
COIL SUPPORT
RAIL
PRIMARY
CONDENSATE
DRAIN
REFRIGERANT
CONNECTIONS
SECONDARY
CONDENSATE
DRAIN
Fig. 5—Conversion for Horizontal Right Applications Using A-Coil
A91119
COIL
SUPPORT
RAIL
COIL
BRACKET
DRAIN PAN
SUPPORT
BRACKET
COIL
SUPPORT
RAIL
COIL
BRACKET
METAL HORIZONTAL
DRAIN PAN
SECONDARY
CONDENSATE
DRAIN
PRIMARY
CONDENSATE
DRAIN
REFRIGERANT
CONNECTIONS
AIR SEAL
ASSEMBLY
A
B
C
A
B
C
FACTORY
SHIPPED
HORIZONTAL
RIGHT
APPLICATION
—4—