User`s manual

10.
Lay out Top G3 Pole (10), joint each section Connector to a
straight line as shown.
Assemble the remaining Top G3 Pole (10) in the same way.
Spread the Netting (13) on the trampoline bed, insert a Top G3
Pole (10) into the opening of Top Sleeve on the Netting (13).
Insert the other Top G3 Pole (10) into the opposite opening
of Top Sleeve on the Netting (13).
11. Joint each end of Top G3 Pole (10) by the clip of connector at
each opening. The Top Sleeve of the Netting (13) become a round
shape.
Attach the first hanging point at the upper edge of the Netting (13)
with the G3 Pole (10) to the Plastic Cap (15) of Top Pole (9).
Attach a second hanging point directly across the Netting (13)
from the first hanging point.
Attach the other two hanging point halfway between the first two
hanging points, so four hanging points are attached as shown.
See insert drawing for attached of G3 Pole (10):
19
10
11
11.a
Insert the pole into sleeve of the Netting(13)
Joint the end of each pole by Clip of Connector
Door of Netting
Top Sleeve
Attached Hanging Point:
10.a
Netting(13)
Opening
(11)
Lay out G3 Pole and Joint each section
to one straight line.
Black G3
Black G3
Black G3 Black G3
G3 Pole(10)
Netting
(15)
5 Sections Per Line
Top G3 Pole(10)
Plastic cap (15)
Hanging point 3
Hanging
point 2
Hanging point 1
Hanging point 6
Hanging point 4
Hanging point 5
9
8
2
Netting
(13)
Door of Netting