Owner`s manual

20
9. Do not attempt to modify any portion/component of an RPC unit.
BayTech or another authorized service technician must perform
any internal changes. For more information, please contact
BayTech at 228-467-8231 or call toll free inside the United States
at 800-523-2702.
Applying power illuminates a green LED on the front panel of the RPC.
When the power switch is off , devices connected to the unit are not
receiving power (off).
RPC INSTALLATION
____________________________________________________________
3.4 POWER ON/OFF STATE
Each receptacle is individually controlled by an internal relay. Upon
initialization of power, the status of each receptacle will return to the state
it was in prior to losing power. For example, if Outlet 1 and Outlet 2 are
“ON” and power is removed from the RPC, the status of Outlet 1 and
Outlet 2 will return to “ON” when power is restored to the RPC.
3.5 POWER UP SEQUENCE
In order to minimize power surges, the RPC sequences power to each
outlet in the “ON” state in 0.3-second intervals. When power is applied to
the RPC, the initialization sequence requires a delay of 10 seconds before
power is available at the service receptacles. Following the 10-second
delay, the RPC sequences power to each outlet that is turned “ON.”
Beginning with Outlet 1 and continuing to each outlet in the “ON” state,
power is sequenced in 0.3-second intervals. If you choose the option
requesting the RPC to reboot all connected equipment, the RPC sequences
power to each outlet turned “ON” in 0.1-second intervals.
3.6 CIRCUIT BREAKER
In the case of power overload, the circuit breaker automatically trips.
Determine the cause of the tripped circuit breaker. Correct the problem
then reset the circuit breaker by depressing the circuit breaker switch.
Power to the RPC base unit (electronics, EIA-232 port, etc.) does not go