Installation manual

10 Reseat the DIMM into place, pushing it gently as far as it will go into the socket (there should be a
clicking sound signifying the DIMM is fully seated). When it is fully seated the latches will lock back
into place.
Figure 72: Push to reseat the DIMM
Caution
To avoid damage, the DIMM is polarized and will not go in the socket when rotated in the
wrong direction.
11 Repeat steps 6 through 9 for the second DIMM.
Packing the Chassis for Shipping
Prepare, remove, and assemble the shipping box for returning the chassis.
You need the following tools and materials to pack a chassis:
Original shipping cover for the front module slots
Lifting handles that were shipped with the chassis
Original shipping box and packing materials
Screwdriver for ground lug screws
Four rack-mounting screws for attaching the support brackets to the rack (if they have been
removed)
#2 Phillips screwdriver for removing the chassis from the rack
Nylon package strapping material and a crimping tool
Perform the following steps to pack the chassiss for shipping:
1 Set the pallet in a convenient, stable location near the equipment rack.
2 Prepare the chassis for removal.
3 Remove the chassis from the rack.
4 Assemble the shipping container.
Preparing the Chassis for Removal
To prepare the chassis for removal from the rack, remove the installed modular components.
1 Turn off the power to the chassis and remove the installed power supplies.
a Remove the power cord retainer and disconnect all power cords.
b Remove all the installed power supplies.
Maintaining the BlackDiamond X series
BlackDiamond X Series Switches Hardware Installation Manual 96