Installation manual

5 Installing a BlackDiamond X series
Series Chassis
Unpacking the Chassis
Checking Pre-Installation Requirements
Rack-Mounting the Chassis
Grounding the Chassis
Installing Power Supplies
Connecting Power Cords
Before you install the BlackDiamond X series Chassis, read the information in Safety Information on
page 102. Installing the BlackDiamond X series chassis requires two people to maneuver the switch
and attach mounting hardware. Make sure there is adequate space behind the rack to provide access
for installing power supplies, cables, and modules.
The chassis should be installed before the modules and module blanks are installed. The chassis is
designed to fit into a standard 19-inch equipment rack. Optional mid-mount brackets allow you to
install the chassis in a mid-mount position.
Unpacking the Chassis
Use this procedure to safely remove the chassis from the box.
Caution
An unpopulated BlackDiamond X series chassis weighs approximately 152 pounds (69 kg) as
shipped. Lifting the BlackDiamond X series chassis safely requires a minimum of two people
or appropriate lifting equipment.
Note
Save all packaging, bolts, and washers, as well as the box and pallet, for future use in the
event that the chassis must be moved to another location or returned to Extreme Networks.
Refer to the illustrations printed on the BlackDiamond X series shipping container and unpack the
chassis and accessories.
BlackDiamond X Series Switches Hardware Installation Manual 46