Installation guide
Installing the E4G-400 Cell Site Aggregation Router
E4G Series Routers Hardware Installation Guide
67
5 Slide the cover into place over the terminal block (Figure 43).
Figure 43: Connecting the DC Power Cables (Part 2)
6 Connect the cables to the DC source voltage, using hardware appropriate to the installation site and
following local and national electrical codes.
7 Energize the DC circuit.
Leave the ESD strap permanently connected to the rack, so that the strap is always available when you
need to handle ESD-sensitive components.
Installing Port Option Cards
You can install the following port option cards at the back of the E4G-400 router:
● Slot A:
- XGM3S-2sf option card
- XGM3S-2xf option card
● Slot B:
- XGM3SB-4sf option card
- E4G-B16T1E1 option card
You can install or remove a port option card in the E4G-400 router without powering down the router;
however, you must reboot the router to initialize a newly installed option card.
SH_211
(+)
(–)
RTN
-48V