Installation guide
Chapter 3: Installing an E4G Series Router
E4G Series Routers Hardware Installation Guide
50
Grounding the Router
Before you connect the power input cable to an E4G-200 series router, you must ground the router,
following the instructions in this section.
A grounding lug is located on the front of the router (Figure 19). You can move the lug to the back
panel (Figure 19) if this location is more suitable for your installation site.
Figure 19: Possible Grounding Lug Locations on the E4G-200 Series Router
WARNING!
Connect the ground wire before you connect any power cables.
To ground the router:
1 If necessary, move the grounding lug to the back panel of the router.
2 At one end of the ground wire, strip the insulation to expose 1/2 inch (12 mm) of bare wire.
3 Loosen the screw, and insert the stripped wire into the grounding lug (Figure 20).
4 Using a 1/4-inch straight-tip torque screwdriver, tighten the retaining screw to 20 pound-inches
(2.25 Newton-meters).
Figure 20: Grounding the E4G-200 Series Router
5 Connect the other end of the wire to a known reliable earth ground point at your site.
CSR_016
Front
Back
CSR_017