Installation guide

Evaluating and Meeting Cable Requirements
E4G Series Routers Hardware Installation Guide
37
Figure 12: Properly Secured Rack
Brace open equipment racks if the channel thickness is less than 1/4 inch (6.4 mm).
Outdoor Installation Sites
The E4G-200 series router may be installed in locations outside of buildings. For outdoor installation
sites, be aware of the following considerations:
Prevent unauthorized access to equipment locations and make sure that only qualified service
personnel have access to the equipment.
Take reasonable precautions to prevent animals from gaining access to the equipment.
Be sure that the ventilation in the installation site is adequate to maintain atemperature below 65° C
(149° F) for the E4G-200 series router.
For proper airflow through the router, leave clear space on the left and right sides of the router.
Evaluating and Meeting Cable Requirements
This section addresses requirements for the cable you should use when installing your network
equipment. It includes:
Cabling Standards
Cable Labeling and Record Keeping
Installing Cable
RJ-45 Connector Jackets
Radio Frequency Interference
CSR_030