Installation guide
Nortel Networks 5399 Access Switch Hardware Installation Guide
Chapter 2 Installing the Model 5399 Remote Access Concentrator Module
2-6
Table 2-2. Segment Selection DIP Switch Settings
Installing the Module into the Hub
To install and secure the module into the System 5000 Hub, follow these
steps:
1. Remove the blank filler panel from the chassis slot where
youintendtoinstallthemodule.
2. Verify that the module jumpers are set correctly (see
“
Setting the Backplane Ethernet Segment” on page 2-3).
3. Extend the inserter/extractor levers to their fully extended
positions (see Figure 2-2
).
DIP Switch S1
Switch Number
Jumper Card Connects
J5, J21 (Segment Bank 1-6)
Jumper Card Connects J5,
J22 (Segment Bank 7-12)
1 (default) Segment 1 Segment 7
2 Segment 2 Segment 8
3 Segment 3 Segment 9
4 Segment 4 Segment 10
5 Segment 5 Segment 11
6 Segment 6 Segment 12
Network management software can override this DIP switch
setting, so an installed module may connect to a different
segment (within the segment bank) than is indicated by the DIP
switch setting.