Installation guide
Remote Annex 2000 Hardware Installation Guide
Chapter 4 Troubleshooting Procedures
4-4
Activity N2: Testing
the Hardware
During the power-up sequence, the Remote Annex 2000 runs a series
of self-test diagnostics. These tests verify internal hardware functions.
The Power LED lights for a few seconds, then Unit and Active LEDs
flash during the power-up self-tests. After the self-tests complete,
only the Unit and Power LEDs remain on.
Activity N3: Testing
the Network
The Remote Annex 2000 sends a short packet addressed to itself
through the transceiver to test the transceiver and its cable. After
passing this test, the Net LED flashes and remains on.
Activity N4: Looking
for the Boot File
The Load LED flashes while the Remote Annex 2000 waits for a load
server host to respond to its load request.
Activity N5:
Loading the Code
The Load LED lights while the Remote Annex 2000 loads its
operational code from a load server host.
If a port is set up for syslogging, the associated LED will flash
when data is output on the port, thus interfering with the
normal LED sequence.
Activity N6:
Running the
Operational Code
The Load LED turns off when the proper image is loaded. The
operational code has control, and the Remote Annex 2000 is ready.