Hardware reference guide

Palo Alto Networks Compliance Statement • 33
May 14, 2015 - Palo Alto Networks COMPANY CONFIDENTIAL
Chapter 5
Compliance Statement
NEBS Requirements
This section describes the Network Equipment Building System (NEBS) requirements for the PA-5000
Series.
The PA-5000 Series is intended to be installed in a Network Telecommunication Facilities (Central
Office) as part of a Common Bonding Network (CNB).
The battery return (BR) input terminals are considered to be an Isolated DC return (DC-1).
Bare conductors must be coated with an appropriate antioxidant compound before crimp
connections are made. All un-plated connectors, braided strap, and buss bars must be brought to a
bright finish and then coated with an antioxidant before they are connected.
Fastening hardware shall be compatible with he materials being joined ad shall preclude loosening,
deterioration, and electrochemical corrosion of the hardware and the joined materials.
WARNING: The intra-building ports of this equipment or subassembly is suitable for
connection to intra-building or unexposed wiring or cabling only. The intra-building ports
of equipment or subassembly must not be metallically connected to interface that connect
to the OSP or it’s wiring. These interfaces are designed for use as intra-building interfaces
only (Type 2 or 4 ports as described in GR-1089-CORE, issue 5) and require isolation
from the exposed OSP cabling. The addition of primary protectors is not sufficient
protection in order to connect these interfaces metallically to OSP wiring. INtra-building
cabling must be shielded and grounded at both ends.