Technical data

5.0 Installation
12
5.4 Fitting the Fire (continued)
7. Fit the fire gas supply pipe at the motorised
valve inlet (Fig. 18).
8. Fit the fire gas supply pipe to the gas service
cock on the right hand side of the boiler base
ensuring gas soundness is done at both
connections on the gas supply pipe (Fig. 19).
9. Connect the electrical supply to the fire from
the boiler (Fig. 17).
10. Unpack the glass and fit two of the amber
pieces vertically between the tabs at the rear,
and the remaining one between the two bulbs at
the front (Fig. 20).
11. Lay the glass retaining assembly into the
opening in the fire box, locating the slot over the
central back tab (Fig. 21).
Fire Gas
Supply Pipe
Fig. 18
Fig. 17
Fig. 19
Fire Gas Supply Pipe
at Service Cock end
Control Box
Electrical Supply
From Boiler
Base
Amber Glass Pieces
Combustion Box Base
Glass Retaining
Assembly
Fig. 20
Amber Glass Pieces
Fig. 21
Central Back Tab