DE-STRATIFICATION:
COMBINED VESSELS
The Destratification pump is supplied fully fitted, only wiring is required
PRE HEAT VESSELS.
The Destratification pump is supplied fitted
SENSORS
PRE-HEAT VESSELS: The solar sensor (T2) can be located at higher level when a pre-
heat is used.
The Primary heating sensor is loacted in a second vessel if supplied.
If the unit is supplied with the MAXXflo unit there is no requirement for primary heating
sensor as control is carried out by the MAXXflo.
See Fig 8 for location.
COMBINED TWIN: The sensor (T2) is located in the lower section with the solar coil.
The primary heating sensor is located at higher level. (refer to controller instructions for
connection maker).
See Fig 8 for location.
COLD FEED:
It is essential that any cold feed line to the system complies with the relevant water
regulations.
The cold feed equipment supplied is designed for the flow rate of the equipment supplied.
This should not be used to feed any other systems.
PREHEAT TWIN VESSEL SYSTEMS: preheat and topup
The vessels need to be connected together with appropiate sized pipe-work (see cold feed)
the vessel installed as per installation instructions.
Connections must leave top of the pre-heat vessel and enter the bottom of the ‘Top UP’
vessel
PREHEAT MAXXflo SYSTEMS:
As above. Connections however leave top of the pre-heat vessel and enter the cold feed in
connection in the MAXXflo.